Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Warehouse location and distribution problem for heating lignite.
Date
1985
Author
Ayaroğlu(Karataylı), Pınar
Metadata
Show full item record
Item Usage Stats
44
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/10011
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
Inventory control in pharmaceutical industry-a special case of a whole saling company.
Öner, Refia; Department of Industrial Engineering (1975)
Storage reliability analysis of solid rocket propellants
Hasanoğlu, Mehmet Sinan; Dağ, Serkan; Department of Mechanical Engineering (2008)
Solid propellant rocket motor is the primary propulsion technology used for short and medium range missiles. It is also commonly used as boost motor in many di_erent applications. Its wide spread usage gives rise to diversity of environments in which it is handled and stored. Ability to predict the storage life of solid propellants plays an important role in the design and selection of correct protective environments. In this study a methodology for the prediction of solid propellant storage life using cumu...
Inventory problems under seasonal stochastic demand pattern
Doğusoy, Enis Behçet; Erkip, Nesim; Department of Electrical Engineering (1988)
Manufacturing lead time estimation using data mining
Ozturk, Atakan; Kayaligil, Sinan; Özdemirel, Nur Evin (Elsevier BV, 2006-09-01)
We explore use of data mining for lead time estimation in make-to-order manufacturing. The regression tree approach is chosen as the specific data mining method. Training and test data are generated from variations of a job shop simulation model. Starting with a large set of job and shop attributes, a reasonably small subset is selected based on their contribution to estimation performance. Data mining with the selected attributes is compared with linear regression and three other lead time estimation metho...
Plant layout application for a valve making company by using clustering method
Khosravi, Oskue Homayoon; Şen, Tayyar; Department of Industrial Engineering (1993)
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
P. Ayaroğlu(Karataylı), “Warehouse location and distribution problem for heating lignite.,” Middle East Technical University, 1985.