E-MORB- and OIB-type Metabasalts From The Karakaya Complex: Trace Element Evidence for Melting across the Spinel-Garnet Transition

2008-12-30

Suggestions

E ect of PEO containing additives on fouling behaviour of PES based ultra ltration membranes
Kaltalı, Gülçin; Kalıpçılar, Halil; Çulfaz Emecen, Pınar Zeynep (null; 2015-09-10)
E-Beam lithography designed substrates for surface enhanced Raman spectroscopy
CİNEL, NEVAL AYŞEGÜL; Cakmakyapan, Semih; Butun, Serkan; Ertaş, Gülay; ÖZBAY, Ekmel (2015-06-01)
Surface Enhanced Raman Spectroscopy (SERS) is a popular method that amplifies weak Raman signals from Raman-active analyte molecules making use of certain specially-prepared metallic surfaces. The main challenge in SERS is to design and fabricate highly repeatable, predictable, and sensitive substrates. There are many fabrication methods that strive to achieve this goal, which are briefly summarized in this paper. The E-beam lithography method is proposed to be superior to the mentioned techniques. In this ...
E-performance of Turkey and a new e-transformation metric system
Afacan, Gülgün; Arifoğlu, Ali; Department of Information Systems (2009)
Affected by continuous developments and innovations in information and communication technologies, governments have initiated the e-transformation process to adopt the knowledge based economy and to be competitive in global world. Throughout their journey of e-transformation, governments need to learn where they are in order to shift their position to advanced level. To assist governments in their evaluation of e-transformation, this thesis offers a metric system derived from some of the well known e-govern...
E-Cosmic: A Business Process Model Based Functional Size Estimation Approach
Kaya, Mahir; Demirörs, Onur (2011-09-02)
Software size is the key input for cost and effort estimation models. The effort and cost estimations as well as software size is needed at as early a phase of the project as possible. Conventional Early Functional Size Estimation methods enable predicting size at early phases but frequently variation of the results are high due to manual calculations and requirements of high degree of interpretation in situations where there is a lack of structured artifacts. On the other hand, automated Functional Size Me...
E-cosmic: a business process model based functional size estimation approach
Kaya, Mahir; Demirörs, Onur; Department of Information Systems (2010)
The cost and effort estimation of projects depend on software size. A software product size is needed at as early a phase of the project as possible. Conventional Early Functional Size Estimation methods generate size at the early phase but result in subjectivity and unrepeatability due to manual calculation. On the other hand, automated Functional Size Measurement calculation approaches require constructs which are available in considerably late software development phases. In this study we developed an ap...
Citation Formats
K. Sayıt, M. C. Göncüoğlu, and T. Furman, “E-MORB- and OIB-type Metabasalts From The Karakaya Complex: Trace Element Evidence for Melting across the Spinel-Garnet Transition,” presented at the AGU Fall Meeting, California, Amerika Birleşik Devletleri, 2008, Accessed: 00, 2023. [Online]. Available: https://hdl.handle.net/11511/102431.