Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Seismic Assessment of Electrical Equipment in Power Substations: A Case Study for Circuit Breakers
Download
index.pdf
Date
2024-07-01
Author
Kaatsiz, Kaan
Alici, Fırat Soner
Erberik, Murat Altuğ
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
55
views
158
downloads
Cite This
Electric power is essential in post-earthquake periods for the continuous functionality of disaster management and emergency services. In addition, interruption of electric power can cause significant economic losses due to downtime of critical facilities. Therefore, it is very important to maintain seismic safety of electric power systems and components. There are existing seismic regulations and standards regarding electric power systems, especially in the United States of America (USA) and Europe. A similar regulation has been prepared recently in Türkiye, which is a country in a seismically active region. This study focuses on the current state of practice regarding the seismic assessment of electrical equipment in power stations and implementation of the regulations on seismic qualification of these systems. Among many electrical equipment, circuit breakers have been selected for case study. The seismic assessment of the selected high voltage equipment has been performed according to the new regulation under the seismic hazard specifically defined for Türkiye. The case study experiment presents the new methodology in evaluating and classifying the seismic response of high voltage electrical equipment and provides insight to the expected behaviour of circuit breakers under earthquake induced action.
Subject Keywords
circuit breaker
,
electrical equipment
,
power station
,
seismic assessment
,
seismic qualification
URI
https://hdl.handle.net/11511/110794
Journal
Turkish Journal of Civil Engineering
DOI
https://doi.org/10.18400/tjce.1241107
Collections
Department of Civil Engineering, Article
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
K. Kaatsiz, F. S. Alici, and M. A. Erberik, “Seismic Assessment of Electrical Equipment in Power Substations: A Case Study for Circuit Breakers,”
Turkish Journal of Civil Engineering
, vol. 35, no. 4, pp. 49–68, 2024, Accessed: 00, 2024. [Online]. Available: https://hdl.handle.net/11511/110794.