Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Project Appraisal Technique in the Public Sector: A Case Study of the Çaycuma Paper Mill Project
Download
1975 yaz - 8 57-90 PROJECT APPRAISAL TECHNIQUE IN THE PUBLIC SECTOR.pdf
Date
1975
Author
Karataş, Cevat
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
28
views
20
downloads
Cite This
In the present paper an attempt will be made to examine the economic appraisal of the Çaycuma Paper Mill Project which was set up by SEKA, a public enterprise in Turkey. Our intention is simply to draw some attention to the defects of the project evalua tion method of SEKA which reflects more or less the general approach of most of the State Economic Enterprises (SEE), in par ticular prior to 1970. The criterion adopted by SEKA was the "accounting rate of return" rule which might be considered to be rather misleading and far from being reliable when projects are evaluated from the standpoint of economic evaluation. Therefore, this rule will be critically discussed and its theoretical and practical weaknesses will be elucidated. The project in question will then be analysed on the basis of both the internal rate of return and the social present value (SPV) rules so as to check its acceptability from the point of view of society. In this section the appraisal of the project will be based on the more accurate data provided by the SPO (State Planning Organisation) rather than the data given in the SEKA Report.
URI
https://hdl.handle.net/11511/112369
Journal
ODTÜ Gelişme Dergisi
Collections
Department of Economics, Article
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
C. Karataş, “Project Appraisal Technique in the Public Sector: A Case Study of the Çaycuma Paper Mill Project,”
ODTÜ Gelişme Dergisi
, vol. 2 (1975), no. 8 yaz(1975), pp. 57–90, 1975, Accessed: 00, 2024. [Online]. Available: https://hdl.handle.net/11511/112369.