Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling
Download
buildings-15-01224.pdf
Date
2025-04-01
Author
Omotayo, Temitope
Tanyer, Ali Murat
Deng, Jiamei
Kaima, Agnes
Akponeware, Anderson
Pekeriçli, Mehmet Koray
Shikder, Shariful
Ogunnusi, Mercy
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
70
views
1
downloads
Cite This
The promotion of uptake of building information modelling (BIM) and circular economy (CE) in the UK and Turkiye construction sectors can be enhanced with the addition of AI. Thus, AI-enabled BIM and CE must be addressed from the viewpoint of current practices and capabilities. This study conducted a comparative study of capability maturity modelling (CMM) backed by a state-of-the-art (SOTA) review of 24 peer-reviewed publications via a validatory approach using a focus group webinar of eight experts in the UK and Turkiye. The findings, as extracted through a validated CMM framework of seven dimensions, were used to identify the position of the UK and Turkiye in terms of AI in BIM and CE. It was discovered that the UK is in a position regarding adoption, government policies and incentives at a defined level. AI growth is required in terms of technological advancement, education and training, industry readiness, cultural attitudes and resistance because they are in a managed phase. It was confirmed that Turkiye is at the initial stage of AI adoption, education, training, incentives, policies, technology and cultural attitudes. The originality of this study lies in the recommendations for a 10-year CMM adoption timeframe towards an optimised level. The conclusions of this manuscript will influence government, education, research and technological policies in the UK and Turkiye.
Subject Keywords
AI
,
BIM
,
circular economy
,
construction sector
,
Turkiye
,
UK
URI
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=105003678940&origin=inward
https://hdl.handle.net/11511/114842
Journal
Buildings
DOI
https://doi.org/10.3390/buildings15081224
Collections
Department of Architecture, Article
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
T. Omotayo et al., “Advancing AI-Powered BIM for Circularity in Construction in the UK and Turkiye: State-of-the-Art Review and Capability Maturity Modelling,”
Buildings
, vol. 15, no. 8, pp. 0–0, 2025, Accessed: 00, 2025. [Online]. Available: https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=105003678940&origin=inward.