Transmission system security study for Akkuyu Nuclear Power Plant

Download
2014
Eren, Sinan
Turkish government is planning to install nuclear power plants in order to increase the number of base power plants and hence to decrease the dependency on natural gas TPPs. In this matter, 4 x 1200 MW Akkuyu NPP will be the first NPP project constructed in Turkey between 2020 and 2023. The project is a critical issue for Turkish Electricity System due to its installed capacity and being first NPP experience in Turkey. Therefore, supply security of Akkuyu NPP is the main concern of Transmission System Operator since NPP unit trips due to voltage excursions or transmission congestions can cause large power loss and undesired cascade transmission events. This thesis provides long-term transmission planning for a large-scale power plant for TSO in the case of Akkuyu NPP. Initially, preliminary studies are presented about expansion plans of transmission and generation systems, regional demand forecast and dispatch scenario forecast to obtain simulation data. Then, transmission system security is investigated through static analyses using PSS/E software. Existing regulations in Turkey state that a nuclear plant must be able to withstand up to N-2 contingency without any interruption. Therefore, detailed load flow and contingency analyses are performed and several transmission congestions are located. Suggestions for enhancing security of the network have been presented. Finally, transmission system stability is investigated through transient analyses using DIgSILENT software. Conditions of remaining in synchronism of Akkuyu NPP to grid are analyzed after a large disturbance in the region occurs. Results have indicated that system is stable after disturbances simulated.

Suggestions

Multi-criteria decision making in site selection for nuclear power plants
Tuncer, Berna; Dener Akkaya, Ayşen.; Department of Statistics (2019)
Nuclear energy is an important alternative energy source. However the construction of nuclear power plants (NPP) requires the consideration of various factors, such as environmental, economic, socioeconomic, health and safety. Accordingly, selection of the most suitable site for the construction of a nuclear power plant yields to a multi-criteria decision making problem. Seismic hazard, environmental conditions, population, health hazards, availability of water resources (for cooling purposes) are among the...
Development of the rule curve for Altıparmak hydroelectric power plant
Boyacıoğlu, Şerife Ece; Kentel Erdoğan, Elçin; Yanmaz, Ali Melih; Department of Civil Engineering (2013)
Energy requirement of Turkey increases day by day and hydropower is currently the main renewable energy source of the country. Thus, planning the development of the unused hydropower potential of Turkey is critical. Available water resources have to be developed and managed in a wise manner. Reservoir operation rule curves are fundamental guidelines for long term reservoir operation. Rule curve which results in the maximum energy generation has to be developed for each hydropower plant (HEPP). The goal of t...
Turkey’s energy system development: Linking an energy supply model with an industrial simulation model and solving it iteratively
Gungor, Gorkem; Sarı, Ramazan (2018-01-01)
Turkey is in the progress to include nuclear energy to its electricity generation capacity. The energy modelling studies for Turkey mainly focus on usage of renewable energy and local fossil fuels and include nuclear power plants (NPP) only with their electricity generation capacities without taking into consideration the front- and back-ends of the nuclear fuel cycle. This study takes into consideration the life cycle assessment (LCA) of nuclear energy based on optimisation of energy system costs and usage...
Maximizing energy generation of a cascade hydropower system /
Karaeren, Vehbi; Altan Sakarya, Ayşe Burcu; Department of Civil Engineering (2014)
Electricity has become one of the main pillars of a well-functioning society and hydroelectric power plants (HEPPs) are one of the main providers of energy in Turkey that are also renewable. To exploit the energy production capacity of existing HEPPs in Turkey and efficient usage of water, operational optimization could help immensely. A non-linear constrained optimization algorithm with an extension, namely a heuristic that provides starting points, has been implemented to maximize the energy production of...
Capacity determination of pumped storage projects using market electricity prices
Çetinkaya, Semih; Tiğrek, Şahnaz; Department of Civil Engineering (2014)
Renewable and clean energy is gaining more importance after the nuclear disasters with increasing awareness of depletion of fossil fuels, concerns about the global warming and increasing energy demand. However, intermittency of renewable resources is the biggest challenge in the restructuring world energy market. Energy has to be stored against sudden changes in the production and consumption. In order to keep the continuity of the energy supply, pumped storage can be a remedy. Therefore, pumped storage pro...
Citation Formats
S. Eren, “Transmission system security study for Akkuyu Nuclear Power Plant,” M.S. - Master of Science, Middle East Technical University, 2014.