Analysis system proposal of construction period, cost and information flow in the governmental buildings

Download
1990
Boynueğri, Vedat

Suggestions

Analysis synthesis model for transient impact sounds by stationary wavelet transform and singular value decomposition
Ahmad, Wasim; Hacıhabiboğlu, Hüseyin; Kondoz, Ahmet (null; 2008-08-24)
We encounter a wide range of sounds everyday which are harmonic, transient or a mixture of both. A number of models have been developed in recent years to synthesise harmonic sounds but these models do not perform effectively on transient sounds because of the sharp attack and decay part of the transient sounds. This paper presents a new technique for analysis-based synthesis of transient sounds by adding orthogonal bases of frequency bands. The proposed technique consists of four stages. First, the sound s...
Analysis, design and construction criteria of submerged tunnels
Bozkurt, Ahmet; Atımtay, Ergin; Department of Civil Engineering (1997)
Analysis and modeling of spatially and temporally varying meteorological parameter : precipitation over Turkey
Aslantaş Bostan, Pınar; Akyürek, Sevda Zuhal; Heuvelink, Gerrad; Department of Geodetic and Geographical Information Technologies (2013)
As precipitation is the very important parameter of climate and hydrology, exploring spatial and temporal distribution and variation of this variable can give an idea about climate conditions and water resources in the future. Therefore accurate mapping of the temporal, spatial and space-time distributions of precipitation is important for many applications in hydrology, climatology, agronomy, ecology and other environmental sciences. In this thesis, temporal, spatial and space-time distributions and variat...
Analysis of modeling effort and impact of different levels of detail in building information models
Leite, Fernanda; Akçamete Güngör, Aslı; Akinci, Burcu; Atasoy Özcan, Güzide; Kiziltas, Semiha (2011-08-01)
The main objectives of this paper are to evaluate the modeling effort associated with generating building information modeling (BIM) at different levels of detail (LoD) and the impact of LoD in a project in supporting mechanical, electrical and plumbing (MEP) design coordination. Results show an increase in total modeling time ranging from doubling the modeling effort to eleven folding it, when going from one LoD to another. When comparing modeling time per object, rates ranged from 0.2 (decreased modeling ...
Analysis Methods for the Investigation of the Seismic Response of Concrete Dams
Aldemir, Alper; Yilmazturk, Sema Melek; Yucel, Ali Riza; Binici, Barış; Arıcı, Yalın; Akman, Altug (2015-01-01)
The consideratiOn of the dam-foundation-reservoir interaction is extremely important for estimating the seismic response of concrete gravity dams. Moreover, nonlinear analysis may be required for determining the possible risk associated with dams. In order to address these issues, DSI recently published the "Guidelines for Seismic Design of Concrete Dams". Authors who have contributed to the preparation of this document provide a perspective on the seismic safety/design of concrete dams and structural analy...
Citation Formats
V. Boynueğri, “Analysis system proposal of construction period, cost and information flow in the governmental buildings,” Middle East Technical University, 1990.