Integrated production information system design in an agricultural tractors manufacturing company.

1979
Kansu, Metin

Suggestions

Integrated risk management applications in offshore windfarm construction
Sümer, Tuba Pelin; Duran, Serhan; Department of Industrial Engineering (2011)
This thesis is motivated by a construction company whose main business operation is foundation installations of offshore wind farm projects. Steel is the main input for most of the foundations. This construction company is confronted with price risk when involved in the procurement part of the foundations. The company receives a fixed payment for the project while paying variable raw material costs which depend on the steel spot price on the procurement date. The construction company should use financial ma...
Integrated FEM/BEM approach to the dynamic and acoustic analysis of plate structures
Kopuz, S; Ünlüsoy, Yavuz Samim; Caliskan, M (1996-06-01)
An integrated finite element/boundary element method approach to the prediction of the interior acoustic radiation of open ended box structures is presented. Dynamic response of the structure is predicted in terms of the nodal displacements under sinusoidal point force excitation using the finite element method. Theoretical results obtained in terms of frequency response functions are verified using the results from tests performed on a box structure. The interior acoustic field is then examined by the boun...
Integrated aircraft-path assignment and robust schedule design with cruise speed control
Safak, Ozge; Gürel, Sinan; Akturk, M. Selim (2017-08-01)
Assignment of aircraft types, each having different seat capacity, operational expenses and availabilities, critically affects airlines' overall cost. In this paper, we assign fleet types to paths by considering not only flight timing and passenger demand, as commonly done in the literature, but also operational expenses, such as fuel burn and carbon emission costs associated with adjusting the cruise speed to ensure the passenger connections. In response to flight time uncertainty due to the airport conges...
Integrated resource leveling and cash flow optimization for construction projects using symbiotic organisms search algorithm
Seyisoğlu, Başak; Sönmez, Rifat; Department of Civil Engineering (2020)
Construction projects are well-known for their inherent complexity as they involve a considerable amount of challenging tasks to be performed in conformance with the contractual documents. Unrealistic schedules that disregard the prominent components such as resources are one of the major reasons for failure of the construction projects. The most widely used scheduling technique is the Critical Path Method (CPM) which usually provides a schedule with unfavorable resource fluctuations. To reduce the negative...
Integrated procurement and transportation planning for purchased components: a case study
Yanık, Hatice Deniz; Bayındır, Zeynep Pelin; Department of Industrial Engineering (2008)
This study is about an integrated procurement and transportation planning system for purchased components of a consumer-durables manufacturer. Due to transportation cost structures and demand characteristics our problem can be classified as a variant of the dynamic-demand joint replenishment problem. The problem is to determine the replenishment policy using the advantages of coordinated transportation of items that will minimize the sum of total inventory holding and tranportation costs over a finite plann...
Citation Formats
M. Kansu, “Integrated production information system design in an agricultural tractors manufacturing company.,” Middle East Technical University, 1979.