A project scheduling methodology to minimize maximum tardiness.

1981
Binbaşıoğlu, Meral

Suggestions

A two stage methodology for fleet scheduling.
Sayın (Akşar), Meral; Department of Operations Research (1984)
A rule based approach in sequencing machining operations for rotational components.
Saygın, Can; Department of Mechanical Engineering (1992)
A computer model for project scheduling under resourse constraints.
Issa, Hisham Ali; Department of Civil Engineering (1987)
A Content-Boosted Collaborative Filtering Approach for Movie Recommendation Based on Local and Global Similarity and Missing Data Prediction
Özbal, Gozde; Karaman, Hilal; Alpaslan, Ferda Nur (Oxford University Press (OUP), 2011-09-01)
Most traditional recommender systems lack accuracy in the case where data used in the recommendation process is sparse. This study addresses the sparsity problem and aims to get rid of it by means of a content-boosted collaborative filtering approach applied to a web-based movie recommendation system. The main motivation is to investigate whether further success can be obtained by combining 'local and global user similarity' and 'effective missing data prediction' approaches, which were previously introduce...
A Damage-based Maintenance and Repair Optimization Method Using Linear Programming for Deteriorating Systems
Akgül, Ferhat (2012-01-01)
Citation Formats
M. Binbaşıoğlu, “A project scheduling methodology to minimize maximum tardiness.,” Middle East Technical University, 1981.