Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
The Fukushima accident was preventable
Download
index.pdf
Date
2015-10-28
Author
Synolakis, Costas
Kanoğlu, Utku
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
125
views
105
downloads
Cite This
The 11 March 2011 tsunami was probably the fourth largest in the past 100 years and killed over 15 000 people. The magnitude of the design tsunami triggering earthquake affecting this region of Japan had been grossly underestimated, and the tsunami hit the Fukushima Dai-ichi nuclear power plant (NPP), causing the third most severe accident in an NPP ever. Interestingly, while the Onagawa NPP was also hit by a tsunami of approximately the same height as Dai-ichi, it survived the event 'remarkably undamaged'. We explain what has been referred to as the cascade of engineering and regulatory failures that led to the Fukushima disaster. One, insufficient attention had been given to evidence of large tsunamis inundating the region earlier, to Japanese research suggestive that large earthquakes could occur anywhere along a subduction zone, and to new research on mega-thrusts since Boxing Day 2004. Two, there were unexplainably different design conditions for NPPs at close distances from each other. Three, the hazard analysis to calculate the maximum probable tsunami at Dai-ichi appeared to have had methodological mistakes, which almost nobody experienced in tsunami engineering would have made. Four, there were substantial inadequacies in the Japan nuclear regulatory structure. The Fukushima accident was preventable, if international best practices and standards had been followed, if there had been international reviews, and had common sense prevailed in the interpretation of preexisting geological and hydrodynamic findings. Formal standards are needed for evaluating the tsunami vulnerability of NPPs, for specific training of engineers and scientists who perform tsunami computations for emergency preparedness or critical facilities, as well as for regulators who review safety studies.
Subject Keywords
General Engineering
,
General Physics and Astronomy
,
General Mathematics
URI
https://hdl.handle.net/11511/44568
Journal
PHILOSOPHICAL TRANSACTIONS OF THE ROYAL SOCIETY A-MATHEMATICAL PHYSICAL AND ENGINEERING SCIENCES
DOI
https://doi.org/10.1098/rsta.2014.0379
Collections
Department of Engineering Sciences, Article
Suggestions
OpenMETU
Core
The depth effect of earthquakes on tsunami heights in the Sea of Okhotsk
Zaytsev, Andrey; Kostenko, Irina; Kurkin, Andrey; Pelinovsky, Efim; Yalçıner, Ahmet Cevdet (The Scientific and Technological Research Council of Turkey, 2016-01-01)
The earthquake of magnitude M-w = 8.3 that occurred on 24 May 2013 in the Sea of Okhotsk was the most powerful earthquake in the region. Fortunately, the generated tsunami was small because of the deep focal depth (609 km) and was only detected by the nearest Deep-ocean Assessment and Reporting of Tsunamis (DART) buoy records. However, the event highlighted the fact that any earthquakes with similar magnitudes at shallower focal depths would have caused considerable tsunamis. In order to evaluate the effect...
Tsunamis: bridging science, engineering and society
Kanoğlu, Utku; Bernard, E.; Synolakis, C. (The Royal Society, 2015-10-28)
Tsunamis are high-impact, long-duration disasters that in most cases allow for only minutes of warning before impact. Since the 2004 Boxing Day tsunami, there have been significant advancements in warning methodology, pre-disaster preparedness and basic understanding of related phenomena. Yet, the trail of destruction of the 2011 Japan tsunami, broadcast live to a stunned world audience, underscored the difficulties of implementing advances in applied hazard mitigation. We describe state of the art methodol...
The 25 march 2020 tsunami at the Kuril islands: Analysis and numerical simulation
Zaytsev, Andrey; Dogan, Gozde Guney; Dolgikh, Grigory; Dolgikh, Stanislav; Yalçıner, Ahmet Cevdet; Pelinovsky, Efim (2020-11-01)
A strong earthquake with a magnitude of 7.5 occurred near the island of Paramushir (KurilIslands) on 25 March 2020. It caused a weak tsunami in Kamchatka and the Kuril Islands.Earthquake and tsunami data from three DART buoys are discussed and compared withnumerical simulations. It is shown that the calculated and measured tsunami characteristics onthe DART buoys is in very good agreement. There are also data on the recording of thisearthquake by a laser strain-meter installed in the Sea of Japan at Shults ...
The September 28th, 2018, Tsunami In Palu-Sulawesi, Indonesia: A Post-Event Field Survey
Omira, R.; Dogan, G. G.; Hidayat, R.; Husrin, S.; Prasetya, G.; Annunziato, A.; Proietti, C.; Probst, P.; Paparo, M. A.; Wronna, M.; Zaytsev, A.; Pronin, P.; Giniyatullin, A.; Putra, P. S.; Hartanto, D.; Ginanjar, G.; Kongko, W.; Pelinovsky, E.; Yalçıner, Ahmet Cevdet (Springer Science and Business Media LLC, 2019-2-28)
On September 28th, 2018, a powerful earthquake (M-w 7.5) struck the Island of Sulawesi in Indonesia. The earthquake was followed by a destructive and deadly tsunami that hit the Bay of Palu. A UNESCO international tsunami survey team responded to the disaster and surveyed 125km of coastline along the Palu Bay up to the earthquake epicentre region. The team performed 78 tsunami runup and inundation height measurements throughout the surveyed coastline. Measured values reached 9.1m for the runup height and 8....
Structural and Non-Structural Countermeasures and Awareness Studies After the Tsunami Disaster: Case of Japan
GÜLER, HASAN GÖKHAN; Ozer Sozdinler, Ceren; Arikawa, Taro; Yalçıner, Ahmet Cevdet (2018-09-01)
Tsunami generated by the earthquake with a magnitude of 9.0 on March, 11, 2011 caused a high number of casualties and significant economic loss. Planning and reconstruction studies following the 2011 Tsunami in Japan are important examples of countermeasures to be taken against tsunamis In this study, observations from two field surveys conducted after five years following the tsunami event, focusing on structural and non-structural countermeasures in addition to disaster management and creation of disaster...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
C. Synolakis and U. Kanoğlu, “The Fukushima accident was preventable,”
PHILOSOPHICAL TRANSACTIONS OF THE ROYAL SOCIETY A-MATHEMATICAL PHYSICAL AND ENGINEERING SCIENCES
, pp. 0–0, 2015, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/44568.