Application of work study on brickwall construction for establishing the unit price.

1982
Ayaydin, M. Rhan

Suggestions

Application of simulation technique to water resourse development of Berdan Basin.
Ergin, Cengiz; Department of Industrial Engineering (1973)
Application of risk management process on wave propagation in aerospace medium
Konukcu, Selda; Tulunay, Yurdanur; Department of Aerospace Engineering (2006)
In this thesis, risk management methods are investigated in order to integrate risk management practices into the Turkish Aerospace industry. The research presents the sequence of risk management processes as identification of risk, analysis of risk, risk planning etc. Risk analysis methods named as Risk Ranking and Analytical Hierarchy Process (AHP) are investigated in order to improve reliability and safety of the systems or processes in the aerospace industry. The main aim of using risk ranking and AHP t...
Application of fracture mechanical approach to study the environmentally assisted cracking of aluminium 5052 in 3 % NaC1
Khawaja, Khurram Sajjad; Sarıoğlu, Filiz; Department of Metallurgical Engineering (1991)
Application of line of balance technique for project planning and scheduling in construction industry.
Hassan, Mohammed Jawad; Department of Civil Engineering (1985)
Application of numerical model for tsunami propagation to the Turkish coasts from Fethiye to Datça
Durmuşoğlu, Özcan; Yalçıner, Ahmet Cevdet; Department of Civil Engineering (1998)
Citation Formats
M. R. Ayaydin, “Application of work study on brickwall construction for establishing the unit price.,” Middle East Technical University, 1982.