Location of sleeper factories.

1977
Kesisci, Ilhan

Suggestions

Location of health facilities and geography of health in Ankara.
Berkman, Ayşe Gülden; Tekeli, İlhan; Department of City and Regional Planning (1992)
Location of cement grinding and packaging plants for the reduction of the cost of product to consumer.
Yalçın, Haydar; Department of Mathematics (1972)
Formation of factory settlements within Turkish industrialization and modernization in 1930s : Nazilli printing factory
Doğan, Çağatay Emre; Cengizkan, Ali; Department of Architecture (2003)
Feasibility of biomass heating system in Middle East Technical University, Northern Cyprus Campus
Asumadu-Sarkodie, Samuel; Owusu, Phebe Asantewaa (Informa UK Limited, 2016-01-01)
Global interest in using biomass feedstock to produce heat and power is increasing. In this study, RETScreen modelling software was used to investigate the feasibility of biomass heating system in Middle East Technical University, Northern Cyprus Campus. Weiss Kessel Multicratboiler system with 2 MW capacity using rice straw biomass as fuel and 10 units of RBI (R) CB0500 boilers with 144 kW capacity using natural gas as fuel were selected for the proposed biomass heating system. The total cost of the biomas...
Optimization of hydroelectric power production of Sariyar and Gokcekaya reservoirs by dynamic programming.
Aygün, Ercan; Department of Civil Engineering (1978)
Citation Formats
I. Kesisci, “Location of sleeper factories.,” Middle East Technical University, 1977.