Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Assembly line balancing, a review of balancing techniques.
Date
1970
Author
Ferhatoğlu, Osman
Metadata
Show full item record
Item Usage Stats
103
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/5940
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
Assembly Line Balancing with Task Paralleling
Kaplan, Özlem; Özdemirel, Nur Evin; Department of Industrial Engineering (2004)
In this study, we consider single model deterministic Assembly Line Balancing problem with task paralleling. The objective is to minimize the total cost which is composed of station opening cost and task dependent equipment cost. A branch and bound algorithm that allows two-level task paralleling is proposed. A heuristic algorithm is also developed both for obtaining efficient upper bounds to branch and bound and for achieving good approximate solutions for large sized problems. Computational experiments ar...
Assembly line balancing with multi-manned tasks
Esin, Ceyhan Erdem; Kırca, Ömer; Department of Industrial Engineering (2007)
In this thesis, we define a new problem area for assembly lines. In the literature, there are various studies on assembly line balancing, but none of them consider multi-manned tasks, task to which at least two operators have to be assigned. Two mathematical models and one constraint programming model are developed for both Type-I and Type-II ALB problems. The objective of Type-I problem is to minimize the number of stations whereas the objective of Type-II problem is to minimize the cycle time. In addition...
Assembly line balancing with station paralleling
Ege, Yunus; Azizoğlu, Meral; Özdemirel, Nur Evin; Department of Industrial Engineering (2001)
Assembly line balancing with station paralleling
Ege, Yunus; Azizoğlu, Meral; Özdemirel, Nur Evin (2009-11-01)
We consider the NP-hard problem of assembly line balancing with station paralleling. We assume an arbitrary number of parallel workstations can be assigned to each stage. Every task requires a specified tooling/equipment, and this tooling/equipment should be available in all parallel workstations of the stage to which the task is assigned. Our objective is to find an assignment of tasks to stages so as to minimize sum of station opening and tooling/equipment costs. We propose two branch and bound algorithms...
Assembly line balancing in an electronics company
Arın, Levent; Kandiller, Levent; Meral, Sedef; Department of Industrial Engineering (1999)
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
O. Ferhatoğlu, “Assembly line balancing, a review of balancing techniques.,” Middle East Technical University, 1970.