Measurement and information generation for planning of a water pump manufacturing system.

1986
Ergün (Yener), Nihal

Suggestions

Measurement and information generation for planning of the multi-product production system of valfsel A.Ş..
Günal, Ali Kamil; Department of Electrical Engineering (1986)
Measurement and evaluation of information systems and application: MEIS package
Arifoğlu, Ali; Aktaş, Ahmet Ziya; Department of Computer Engineering (1991)
Measurement and QCD analysis of double-differential inclusive jet cross sections in pp collisions at root s=8 TeV and cross section ratios to 2.76 and 7 TeV
Khachatryan, V.; et. al. (Springer Science and Business Media LLC, 2017-03-01)
A measurement of the double-differential inclusive jet cross section as a function of the jet transverse momentum p(T) and the absolute jet rapidity |y| is presented. Data from LHC proton-proton collisions at root s = 8 TeV, corresponding to an integrated luminosity of 19.7 fb(-1), have been collected with the CMS detector. Jets are reconstructed using the anti-k(T) clustering algorithm with a size parameter of 0.7 in a phase space region covering jet p(T) from 74 GeV up to 2.5 TeV and jet absolute rapidity...
Measurement and evaluation of acoustic properties of domestic building materials
Uyanık, Emel; Seren, Önder; Çalışkan, Mehmet; Department of Architecture (1995)
Measurement-based replanning of cell capacities in GSM networks
Onur, Ertan; Ersoy, Cem; Çaǧlayan, M. Ufuk (2002-08-21)
Due to the scarcity of the spectral resources and mobility of the portables, the call attempts may be blocked during call initiation or terminated during the hand-off process. When the blocking ratio exceeds some grade of service level, the capacity of the congested cell must be replanned using the call attempt data. However, most of the time, the measurements are inflated by the redials and the retrials. During the replanning process, the first step should be to calculate the effective load from the measur...
Citation Formats
N. Ergün (Yener), “Measurement and information generation for planning of a water pump manufacturing system.,” Middle East Technical University, 1986.