Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Heuristic procedures for mulyi-item dicrete lot sizing
Download
013205.pdf
Date
1991
Author
Kaynarca, Arzu
Metadata
Show full item record
Item Usage Stats
66
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/6336
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
Heuristic methods for the capacitated stochastic lot-sizing problem under the static-dynamic uncertainty strategy
Randa, A. Cem; Dogru, Mustafa K.; İyigün, Cem; Ozen, Ulas (Elsevier BV, 2019-09-01)
We consider a lot-sizing problem in a single-item single-stage production system facing non-stationary stochastic demand in a finite planning horizon. Motivated by common practice, the set-up times need to be determined and frozen once and for all at the beginning of the horizon while decisions on the exact lot sizes can be deferred until the setup epochs. This operating scheme is referred to as the static dynamic uncertainty strategy in the literature. It has been shown that a modified base stock policy is...
Heuristic methods for the stochastic lot-sizing problem under the static-dynamic uncertainty strategy
Randa, Ali Cem; İyigün, Cem; Department of Industrial Engineering (2013)
We consider a lot-sizing problem in a single-item single-stage production system facing nonstationary stochastic demand in a finite planning horizon. Motivated by practice, the set-up times need to be determined and frozen once and for all at the beginning of the horizon while decision on the exact lot sizes can be deferred until the setup time. This operating scheme is referred to as the static-dynamic uncertainty strategy in the literature. For a capacitated system with minimum lot size restrictions, it h...
Heuristic procedures for the lot sizing problem with assembly structures
İrfanoğlu, Orhan; Kırca, Ömer; Department of Industrial Engineering (1990)
Heuristic approaches for solid transportation-p-facility location problem
Das, Soumen Kumar; Roy, Sankar Kumar; Weber, Gerhard Wilhelm (Springer Science and Business Media LLC, 2020-09-01)
Determining optimum places for the facilities and optimum transportation from existing sites to the facilities belongs to the main problems in supply chain management. Thesolid transportation-p-facility location problem(ST-p-FLP) is an integration between thefacility location problemand thesolid transportation problem(STP). This paper delineates the ST-p-FLP, a generalization of the classical STP in which location ofp-potential facility sites are sought so that the total transportation cost by means of conv...
Heuristic algorithms for the routing problems with backhauls
Demirel, Özgür; Süral, Haldun; Department of Industrial Engineering (2001)
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
A. Kaynarca, “Heuristic procedures for mulyi-item dicrete lot sizing,” Middle East Technical University, 1991.