A multi-item newsvendor problem with preseason production and capacitated reactive production

2008-08-01
Chung, Chia-Shin
Flynn, James
Kirca, Oemer
Given items with short life cycles or seasonal demands, one can potentially improve profits by producing during the selling season, especially when its production capacity is substantial. We develop a two-stage, multi-item model incorporating reactive production that employs a firm's internal capacity. Production occurs in an uncapacitated preseason stage and a capacitated reactive stage. Demands occur in the reactive stage. Reactive capacities are pre-allocated to each item in the preseason stage and cannot be changed during the reactive stage. Reactive production occurs during the selling season with full knowledge of demands. The objective is expected profit maximization. Unsatisfied demand is lost. The revenue, salvage value, and production and lost sales costs are proportional. Assuming no fixed costs, we present a simple algorithm for computing optimal policies. For a model with fixed costs for allocating preseason stage production and reactive stage capacity to product families, we characterize optimal policies and develop optimal and heuristic algorithms.
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH

Suggestions

A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs
Bayındır, Zeynep Pelin; Frenk, J. B. G. (Elsevier BV, 2007-05-16)
We present a thorough analysis of the economic production quantity model with shortages under a general inventory cost rate function and piecewise linear concave production costs. Consequently, an effective solution procedure, particularly useful for an approximation scheme, is proposed. A computational study is appended to illustrate the performance of the proposed solution procedure.
Optimal allocation and processing time decisions on non-identical parallel CNC machines: epsilon-constraint approach
Gürel, Sinan (Elsevier BV, 2007-12-01)
When the processing times of jobs are controllable, selected processing times affect both the manufacturing cost and the scheduling performance. A well known example for such a case that this paper specifically deals with is the turning operation on a CNC machine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. In this paper, we deal with making optimal machine-job assignments and processing time decisions so as to minimize total manufacturing cost while the ...
Scheduling parallel CNC machines with time/cost trade-off considerations
Gürel, Sinan (Elsevier BV, 2007-09-01)
When the processing times of jobs are controllable, selected processing times affect both the manufacturing cost and the scheduling performance. A well-known example for such a case that this paper specifically deals with is the turning operation on a CNC machine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. We also know that scheduling decisions are quite sensitive to the processing times. Therefore, this paper considers minimizing total manufacturing cos...
The One-Warehouse Multiretailer Problem with an Order-Up-To Level Inventory Policy
Solyali, Oguz; Süral, Haldun; Denizel, Meltem (Wiley, 2010-10-01)
We consider a two-level system in which a warehouse manages the inventories of multiple retailers. Each retailer employs an order-up-to level inventory policy over T periods and faces an external demand which is dynamic and known. A retailer's inventory should be raised to its maximum limit when replenished. The problem is to jointly decide on replenishment times and quantities of warehouse and retailers so as to minimize the total costs in the system. Unlike the case in the single level lot-sizing problem,...
Lagrangean relaxation based heuristics for lot sizing with setup times
Süral, Haldun; Van Wassenhove, Luk N. (Elsevier BV, 2009-04-01)
We consider a lot sizing problem with setup times where the objective is to minimize the total inventory carrying cost only. The demand is dynamic over time and there is a single resource of limited capacity. We show that the approaches implemented in the literature for more general versions of the problem do not perform well in this case. We examine the Lagrangean relaxation (LR) of demand constraints in a strong reformulation of the problem. We then design it primal heuristic to generate upper bounds and ...
Citation Formats
C.-S. Chung, J. Flynn, and O. Kirca, “A multi-item newsvendor problem with preseason production and capacitated reactive production,” EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, pp. 775–792, 2008, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/66415.