Unit commitment by dynamic programming for microgrid operational planning optimization and emission reduction

2011-09-10
Kanchev, H.
Francois, B.
Lazarov, V.
This paper presents a 24 hour ahead microgrid power planning using the approach of unit commitment by dynamic programming. The studied system comprises twelve PV based active generators with embedded storage and three micro gas turbines. Based on the prediction of the energy available from the PV generator, the storage availability, the micro turbine emission characteristics and the load prediction, a central energy management system calculates a 24-hour ahead plan of the power references for three micro gas turbines and the active generators in order to minimize the CO2 equivalent emissions of the gas turbines.

Suggestions

Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems
Saygin, C; Kilic, SE (Springer Science and Business Media LLC, 2004-04-01)
This paper presents a dissimilarity maximization method (DMM) for real-time routing selection and compares it via simulation with typical priority rules commonly used in scheduling and control of flexible manufacturing systems (FMSs). DMM aims to reduce the congestion in the system by selecting a routing for each part among its alternative routings such that the overall dissimilarity among the selected routings is maximized. In order to evaluate the performance of DMM, a random FMS, where the product mix is...
Dynamic optimization of long term primary electric distribution network investments based on planning metrics
Tor, Osman Bulent; CEBECI, Mahmut Erkut; KOC, Mehmet; Güven, Ali Nezih (2018-01-01)
This paper presents methodologies of dynamic planning algorithms which are developed for optimizing long-term primary electric distribution network investments taking into account some planning metrics. First, an algorithm which calculates a representative primary network model of distribution grids whose primary and secondary networks are intricate is developed. It is aimed to facilitate assessment of primary distribution network investment requirements and thereby defining grid investment candidates effec...
Hierarchical parallelisation strategy for multilevel fast multipole algorithm in computational electromagnetics
Ergül, Özgür Salih (Institution of Engineering and Technology (IET), 2008-01-03)
A hierarchical parallelisation of the multilevel fast multipole algorithm (MLFMA) for the efficient solution of large-scale problems in computational electromagnetics is presented. The tree structure of MLFMA is distributed among the processors by partitioning both the clusters and the samples of the fields appropriately for each level. The parallelisation efficiency is significantly improved compared to previous approaches, where only the clusters or only the fields are partitioned in a level.
Optimization of long-term investments of electric distribution systems considering planning metrics
KOC, Mehmet; TOR, Osman Bulent; CEBECI, Mahmut Erkut; Güven, Ali Nezih; GULER, Firat; TASKIN, Hacer; TUNCER, Atiye; OKUL, Ufuk (2017-04-21)
This paper presents a dynamic planning algorithm methodology which optimizes long-term primary electric distribution network investments considering planning metrics. An algorithm which calculates a representative primary network model of distribution grids, whose primary and secondary networks are intricate, is developed. It is aimed to facilitate assessment of primary distribution network investment requirements and thereby defining grid investment candidates effectively. A planning algorithm, which consi...
Nested Iterative Solutions of Electromagnetic Problems Using Approximate Forms of the Multilevel Fast Multipole Algorithm
Onol, Can; Ucuncu, Arif; Karaosmanoglu, Bariscan; Ergül, Özgür Salih (2017-03-24)
Nested iterative solutions using full and approximate forms of the multilevel fast multipole algorithm (MLFMA) are presented for efficient analysis of electromagnetic problems. The developed mechanism is based on preconditioning an iterative solution via another iterative solution, and this way, nesting multiple solutions as layers. The accuracy is systematically reduced from top to bottom by using the on-the-fly characteristics of MLFMA, as well as the iterative residual errors. As a demonstration, a three...
Citation Formats
H. Kanchev, B. Francois, and V. Lazarov, “Unit commitment by dynamic programming for microgrid operational planning optimization and emission reduction,” 2011, p. 502, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/66925.