Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
A computer solution of the two dimensional diffusivity equation by the method of alternating-directional implicit procedure to get an optimum production-injection schedule for a secondary recovery project.
Date
1972
Author
Saka, Hikmet
Metadata
Show full item record
Item Usage Stats
67
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/6940
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
A finite element simulation of frontogenesis by using the semi-implicit time integration scheme with a horizontal deformation field model
Turhangil, H. Turhan; Aksel, Mehmet Haluk ; Department of Mechanical Engineering (1988)
A finite element simulation of frontogenesis in the atmosphere with the primitive equations by using a horizontal deformation fiels model
Kuzucu, Ahmet Soner; Aksel, M.Haluk; Department of Mechanical Engineering (1989)
A finite element simulation of frontogenesis in the atmosphere with the vorticity-divergence formulation by using a horizontal deformation field model
Bilgiç, H. Münci; Aksel, Haluk; Department of Mechanical Engineering (1988)
A convergence study for a longitudinal maneuver by using various tools
Gül, Seyhan; Bilen, M. Emre; Şahin, Murat; Gürak, Derya; Yaman, Yavuz (2016-01-01)
A probabilistic schedule delay analysis in construction projects by using fuzzy logic incorporated with relative importance index (RII) method
Özdemir, Mustafa; Gündüz, Murat; Department of Civil Engineering (2010)
The aim of this thesis is to propose a decision support tool for contractors before the bidding stage to quantify the probability of schedule delay in construction projects by using fuzzy logic incorporated with relative importance index (RII) method. Eighty three (83) different schedule delay factors were identified through detailed literature review and interview with experts from a leading Turkish construction company, then categorized into nine (9) groups and visualized by utilizing Ishikawa (Fish Bone)...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
H. Saka, “A computer solution of the two dimensional diffusivity equation by the method of alternating-directional implicit procedure to get an optimum production-injection schedule for a secondary recovery project.,” Middle East Technical University, 1972.