Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
A Biobjective Approach based on PROMETHEE V for Project Selection Problems
Date
2009-06-01
Author
Çağlar, Musa
Karasakal, Esra
Metadata
Show full item record
Item Usage Stats
178
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/73889
Conference Name
29th Operations Research and Industrial Engineering National Conference, 2009
Collections
Department of Industrial Engineering, Conference / Seminar
Suggestions
OpenMETU
Core
A multicriteria sorting approach based on data envelopment analysis for R&D project selection problem
Karasakal, Esra (Elsevier BV, 2017-12-01)
In this paper, multiple criteria sorting methods based on data envelopment analysis (DEA) are developed to evaluate research and development (R&D) projects. The weight intervals of the criteria are obtained from Interval Analytic Hierarchy Process and employed as the assurance region constraints of models. Based on data envelopment analysis, two threshold estimation models, and five assignment models are developed for sorting. In addition to sorting, these models also provide ranking of the projects. The de...
A probabilistic multiple criteria sorting approach based on distance functions
ÇELİK, BİLGE; Karasakal, Esra; İyigün, Cem (2015-05-01)
In this paper, a new probabilistic distance based sorting (PDIS) method is developed for multiple criteria sorting problems. The distance to the ideal point is used as a criteria disaggregation function to determine the values of alternatives. These values are used to sort alternatives into the predefined classes. The method also calculates probabilities that each alternative belong to the predefined classes in order to handle alternative optimal solutions. It is applied to five data sets and its performanc...
A Hybrid Computational Method based on Convex Optimizationfor Outlier Problems
Yerlikaya Ozkurt, Fatma; Askan Gündoğan, Ayşegül; Weber, Gerhard Wiehelm (2015-11-01)
Statistical modeling plays a central role for any prediction problem of interest.However, predictive models may give misleading results when the data containoutliers. In many applications, it is important to identify and treat the outlierswithout direct elimination. To handle such issues, a hybrid computational methodbased on conic quadratic programming is introduced and employed onearthquake ground motion data set. Results are compared against widely-usedground motion prediction models.
A particle swarm optimization approach for hexahedral mesh smoothing
Yilmaz, A. Egemen; Kuzuoğlu, Mustafa (Wiley, 2009-05-10)
There are some approaches for all-hexahedral mesh quality improvement by means of node-movement while preserving the connectivity. Among these methods, the most easily implemented and well known one is the Laplacian smoothing method; however, for this method mesh quality improvement is not guaranteed in all cases, and this approach might cause inverted elements especially in concave regions. In this work, a method for the improvement of hexahedral mesh shape-quality Without causing inverted elements is prop...
A Construction Delay Analysis Approach Based on Lean Principles
EROL, HACI HÜSEYİN; Dikmen Toker, İrem; Birgönül, Mustafa Talat (2017-07-12)
Delay is a quite common problem for construction projects. The existing practice of construction management is usually based on assessment of delays, liabilities and claims. However, this approach does not serve to remove the underlying causes of delay problems. In addition to estimation of delays, there is a need for a systematic method that will prevent delays in projects. Lean construction has tools and techniques that can serve for this purpose. However, a formal delay analysis procedure does not exist ...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. Çağlar and E. Karasakal, “A Biobjective Approach based on PROMETHEE V for Project Selection Problems,” presented at the 29th Operations Research and Industrial Engineering National Conference, 2009, Türkiye, 2009, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/73889.