A systematic approach for comparing FORTRAN and PL/I programs.

1977
Tariq, Masood Ahmad

Suggestions

A methodology for determining the cluster of a new project
Yiğit, Aybeniz; Saatçioğlu, Ömer; Department of Industrial Engineering (2005)
By definition, all projects are unique; however R&D projects have specific characteristics that make them harder to manage. The project management methodology applied to R&D projects may show differences due to the categorization of them. But if there exists a categorization of projects, one can analyze the properties of the project classes and then manage similar projects similarly. In this study, the R&D projects of a main military electronics company of Turkey, are analyzed. Tunç (2004) has developed a m...
A nomographic approach for estimating the solar heated fraction of buildings.
Irklı, Demet; Department of Building Sciences (1984)
A probabilistic design approach for rock slopes
DUZGUN, HSB; Karpuz, Celal; Yücemen, Mehmet Semih (1998-10-09)
The basic aim of this study is to develop a reliability-based methodology for the practical design of rock slopes. The advanced first-order second-moment (AFOSM) approach is adapted as;the reliability assessment model. In the reliability-based design methodology, the first step is the modeling and quantification of uncertainties associated with the design parameters. Since the safety of a rock slope is most sensitive to the shear strength of discontinuities, the uncertainty analysis is focused on the parame...
A decomposition algorithm for the optimizaiton of water management for large reservoir hydro-power plants.
Aral, Nesip; Department of Electrical Engineering (1980)
A nomographic approach to building dimesions for optimal heat flow.
Tamzok, Jülide; Department of Building Sciences (1984)
Citation Formats
M. A. Tariq, “A systematic approach for comparing FORTRAN and PL/I programs.,” Middle East Technical University, 1977.