Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
A systematic approach for comparing FORTRAN and PL/I programs.
Date
1977
Author
Tariq, Masood Ahmad
Metadata
Show full item record
Item Usage Stats
55
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/7496
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
A methodology for determining the cluster of a new project
Yiğit, Aybeniz; Saatçioğlu, Ömer; Department of Industrial Engineering (2005)
By definition, all projects are unique; however R&D projects have specific characteristics that make them harder to manage. The project management methodology applied to R&D projects may show differences due to the categorization of them. But if there exists a categorization of projects, one can analyze the properties of the project classes and then manage similar projects similarly. In this study, the R&D projects of a main military electronics company of Turkey, are analyzed. Tunç (2004) has developed a m...
A nomographic approach for estimating the solar heated fraction of buildings.
Irklı, Demet; Department of Building Sciences (1984)
A probabilistic design approach for rock slopes
DUZGUN, HSB; Karpuz, Celal; Yücemen, Mehmet Semih (1998-10-09)
The basic aim of this study is to develop a reliability-based methodology for the practical design of rock slopes. The advanced first-order second-moment (AFOSM) approach is adapted as;the reliability assessment model. In the reliability-based design methodology, the first step is the modeling and quantification of uncertainties associated with the design parameters. Since the safety of a rock slope is most sensitive to the shear strength of discontinuities, the uncertainty analysis is focused on the parame...
A decomposition algorithm for the optimizaiton of water management for large reservoir hydro-power plants.
Aral, Nesip; Department of Electrical Engineering (1980)
A nomographic approach to building dimesions for optimal heat flow.
Tamzok, Jülide; Department of Building Sciences (1984)
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. A. Tariq, “A systematic approach for comparing FORTRAN and PL/I programs.,” Middle East Technical University, 1977.