Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Economic Evaluation of Time-Shared Ownership Versus Purchasing a Summer House
Date
1992-09-25
Author
Birgönül, Mustafa Talat
Metadata
Show full item record
Item Usage Stats
101
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/75165
Collections
Unverified, Conference / Seminar
Suggestions
OpenMETU
Core
Economic analysis of multi-stage housing production model
Kaan, Mustafa; Birgönül, Talat; Department of Electrical Engineering (1996)
Economic Analysis of Multi-Storey Core Housing Model
Birgönül, Mustafa Talat; Dikmen Toker, İrem (null; 1997-09-04)
Economic evaluation techniques of urban transportation alternatives.
Birgönül, M. Talat; Department of Civil Engineering (1981)
Economic assessment of the seismic retrofitting of low-cost apartment buildings
Arıkan, Mehmet Fırat; Macit, G (Informa UK Limited, 2005-07-01)
When structural retrofitting of buildings is required due to seismic safety considerations, building owners or government officials are faced with a crucial decision whether to demolish and rebuild their buildings, or retrofit them. Simple decisions based on fixed proportions, such as demolish and rebuild if retrofit costs exceed 40% of the replacement cost, may be misleading. A financial analysis should be carried out considering all the revenues and costs of the building during its life time. A low-cost r...
Economic appraisal of the Bosphorus Tube Tunnel and Đstanbul Metro alternative and their environmental impacts
Karataş, Cevat (Orta Doğu Teknik Üniversitesi (Ankara, Turkey), 2001)
The purpose of this paper is to provide a detailed analysis of the Bosphorus Tube Tunnel and a number of alternative İstanbul metro systems. An attempt is made to compare economically the Bosphorus Tube Tunnel with an Đstanbul Metro system via Taksim and combined alternative which comprises both the Bosphorus tube Tunnel and the Đstanbul metro system by refering to a future no-build baseline alternative. In the analysis, the Little-Mirrlees appraisal method is adopted that requires the estimation of na...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. T. Birgönül, “Economic Evaluation of Time-Shared Ownership Versus Purchasing a Summer House,” 1992, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/75165.