İnşacı Siyasal Erk Nesnesi ile Kamusal Mekan Salınımında Park Göstergenin Nadir Netliği

2015-10-01
Arredamento Mimarlık

Suggestions

A probabilistic schedule delay analysis in construction projects by using fuzzy logic incorporated with relative importance index (RII) method
Özdemir, Mustafa; Gündüz, Murat; Department of Civil Engineering (2010)
The aim of this thesis is to propose a decision support tool for contractors before the bidding stage to quantify the probability of schedule delay in construction projects by using fuzzy logic incorporated with relative importance index (RII) method. Eighty three (83) different schedule delay factors were identified through detailed literature review and interview with experts from a leading Turkish construction company, then categorized into nine (9) groups and visualized by utilizing Ishikawa (Fish Bone)...
İnşaata Dayalı Ekonomik Büyüme Modelinin Konut ve Kentsel Büyüme Üzerindeki Etkileri: Ankara Örneği
Balaban, Osman (TMMOB Şehir Plancıları Odası , 2015-01-01)
Cash flow analysis of construction projects using fuzzy set theory
Melik, Serhat; Sönmez, Rifat; Department of Civil Engineering (2010)
Construction industry is a one of the most risky sectors due to high level of uncertainties included in the nature of the construction projects. Although there are many reasons, the deficiency of cash is one of the main factors threatening the success of the construction projects and causing business failures. Therefore, an appropriate cash planning technique is necessary for adequate cost control and efficient cash management while considering the risks and uncertainties of the construction projects. The m...
A Fuzzy delay assessment tool for construction projects
Ghaziani, Aydin; Dikmen Toker, İrem; Birgönül, M Talat; Department of Civil Engineering (2012)
It is a known fact that construction projects do not often complete on time due to several reasons related with the unexpected changes in the project conditions, external factors or performance of project participants. Since construction projects are unique and limited information is available at the beginning of the projects, prediction of delays is a difficult task. However, if the delays can be assessed at the early stages, their impacts might be minimized, some of the delays can even be eliminated. This...
İnşaat sektöründe istihdam imkanlarının ve optimum tekno-ekonomik stratejinin araştırılması
Sorguç, V.doğan(1972)
Citation Formats
İ. Basa, “İnşacı Siyasal Erk Nesnesi ile Kamusal Mekan Salınımında Park Göstergenin Nadir Netliği,” Arredamento Mimarlık, pp. 127–131, 2015, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/76976.