Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
MOAA and Topology Judgement for Mesh Construction
Date
2004-07-25
Author
Cheng, W.
Sorguç, Arzu
Shinoda, J.
Hagiwara, I.
Metadata
Show full item record
Item Usage Stats
34
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/78181
Collections
Unverified, Conference / Seminar
Suggestions
OpenMETU
Core
MOAA and topology judgment for mesh construction
Cheng, Wen-Jie; Sorguç, Arzu; Shinoda, Junichi; Hagiwara, Ichiro (2004-11-17)
In this paper, the Maximum Opposite Angulation Approach (MOAA) for 3-D including the topology optimization is discussed. The MOAA algorithm is developed to generate meshes in 2-D and 3-D. The basic principles of the algorithm both in 2-D applications and in 3-D applications, is to pre-set uniformity to the initial data set to form point pairs yielding possible shortest line segments. These line segments are connected with the points providing the maximum angle for the vertex of the triangular mesh to be con...
MOFCA: Multi-objective fuzzy clustering algorithm for wireless sensor networks
SERT, SEYYİT ALPER; Bagci, Hakan; Yazıcı, Adnan (2015-05-01)
This study introduces a new clustering approach which is not only energy-efficient but also distribution-independent for wireless sensor networks (WSNs). Clustering is used as a means of efficient data gathering technique in terms of energy consumption. In clustered networks, each node transmits acquired data to a cluster-head which the nodes belong to. After a cluster-head collects all the data from all member nodes, it transmits the data to the base station (sink) either in a compressed or uncompressed ma...
MoOx/Ag/MoOx multilayers as hole transport transparent conductive electrodes for n-type crystalline silicon solar cells
Akdemir, Ozan; Borra, Mona Zolfaghari; Nasser, Hisham; Turan, Raşit; Bek, Alpan (Wiley, 2020-03-25)
Substitution of highly doped layers with conventional transparent conductive electrodes as carrier collecting and selective contacts in conventional crystalline silicon (c-Si) solar cell configurations is crucial in increasing affordability of solar cells by lowering material costs. In this study, oxide/metal/oxide (OMO) multilayers featuring molybdenum oxide (MoOx) and silver (Ag) thin films are developed by thermal evaporation technique, as dopant-free hole transport transparent conductive electrodes (HTT...
MOKA An object oriented framework for FMI co simulation
Aslan, Memduha; Oğuztüzün, Mehmet Halit S.; Durak, Umut; Taylan, Koray (null; 2015-07-23)
An Functional Mockup Unit (FMU) is defined as a model that realizes the Functional Mock-up Interface (FMI)which provides a standard interface for dynamic system models to run in both model-exchange and co-simulation settings. While the standard provides a solid model interface specification, it does not provide its user with any guidelines on how to develop FMUs and how to integrate them for co-simulation. In this paper, MOKA, an object-oriented co-simulation framework for FMUs, is introduced. Based on FMI,...
FMEA-based methodology for delay analysis of construction projects
Dumlu, Aycan; Dikmen Toker, İrem; Birgönül, Mustafa Talat; Department of Civil Engineering (2020-9)
Delay is prevalent in construction projects. Projects can hardly be completed on estimated targets due to emergent risk factors. Decision makers need a delay analysis method to estimate construction duration accurately, considering the occurrence of several risk events. Due to the non-existence of historical databases about previous projects and the one off nature of construction projects; the expertise of project managers is a valuable source of knowledge for delay analysis. In this study, the objective is...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
W. Cheng, A. Sorguç, J. Shinoda, and I. Hagiwara, “MOAA and Topology Judgement for Mesh Construction,” 2004, vol. 482, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/78181.