Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Reconstruction of Partially Collapsed Post-Tensioned Begendik Bridge During Balanced Cantilever Construction
Date
2018-11-06
Author
Caner, Alp
Metadata
Show full item record
Item Usage Stats
56
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/80878
Collections
Unverified, Conference / Seminar
Suggestions
OpenMETU
Core
Rehabilitation of Malatya Narli No: 7 Railroad Tunnel
Divleli, Barış; Ünal, Erdal; Department of Mining Engineering (2004)
In thesis thesis, studies associated with the rehabilitation of the Malatya-Narli No: 7 Railroad Tunnel are presented. The rehabilitation work includes cleaning of two collapses and stopping of deformations occurring in the tunnel as well as characterizing the rock-mass by evaluating the cores obtained from 67 drill holes. Due to two collapses ocurred in the tunnel a large sinkhole (15x10x20 meters) was developed at the surface and the tunnel closed to train traffic for 10 months (September, 2002-July, 2003...
Tarihi Kurt Köprüsü (Mihraplı köprü, Vezirköprü) Restorasyonu Proje Ve Uygulama Çalışmaları
Halifeoğlu, F.Meral; Sert, Halide; Yılmaz, Süheyla (Middle East Technical University, Faculty of Architecture, 2013-12-1)
Apart from the construction of the new roads and bridges, it is one of the principal duties of the General Directorate of Highways to repair and maintain the historical bridges in accordance with the projects to be produced or caused to be produced by the General Directorate of Highways. Pursuant to the inventory records of historical bridges (kept until December 2012), it has been observed that there exist a total of 1646 each bridges in our country which is located on First Degree Seismic Zone, dating bac...
Strengthening of reinforced concrete frames with reinforced concrete infills
Altın, Sinan; Ersoy, Uğur; Department of Civil Engineering (1990)
Reconstruction of Memory and Memorials in Szigetvár
Peker, Ali Uzay (Selçuk University; Selçuk University; 2017-12-31)
Recent discovery of the Tomb of Sultan Suleiman within a palanka (redoubt) close to the town of Szigetvár proved to be a worldwide archaeological event with unexpected repercussions. The Tomb of Suleiman has been a major source of scholarly and public interest, but the central role of the historic town of Szigetvár has also become highlighted. In 1566, Sultan Suleiman went to the location for the reason to take Szigetvár and died in his royal tent close to the town one night before the downfall of it. They ...
Strengthening of a single track railroad steel truss bridge with addition of a two lane highway deck
Caner, Alp; Sarici, Barbaros (2013-01-01)
The need for a highway link was highlighted after 12 people died in a ferry accident in 2002 on the Karakaya Dam reservoir near Malatya, Turkey. The closest link to the ferry route is a thirty year old, 2030 meter long single track steel truss railroad bridge. The existing bridge, with 29 identical spans, is supported on massive piers. The existing steel truss superstructure has design-originated seismic deficiencies. This is because the current seismic requirements of the bridge specifications have increas...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
A. Caner, “Reconstruction of Partially Collapsed Post-Tensioned Begendik Bridge During Balanced Cantilever Construction,” 2018, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/80878.