Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
İnşaat Sözleşmelerinde Ortaya Çıkması Olası Uyuşmazlıkların Tahmin Edilmesi Üzerine Alternatif bir Yaklaşım
Date
2016-11-05
Author
Ayhan, Murat
Birgönül, Mustafa Talat
Dikmen Toker, İrem
Metadata
Show full item record
Item Usage Stats
224
views
0
downloads
Cite This
URI
http://makine.anadolu.edu.tr/dosya/pyyk2016.pdf
https://hdl.handle.net/11511/81836
Collections
Unverified, Conference / Seminar
Suggestions
OpenMETU
Core
Using Post-Project Reviews for Risk Assessment of Construction Projects
Shokouhi, Pegah; Birgönül, Mustafa Talat; Dikmen Toker, İrem; Department of Civil Engineering (2022-8-26)
Risk management (RM) is about identifying risk factors, analyzing their impacts on project success, and developing management strategies to mitigate them. Learning from previous projects to make better predictions in forthcoming projects is critical for the success of RM activities. Many construction companies conduct post-project reviews (PPRs) to record lessons learned (LL) from projects. However, if these reports do not contain the necessary risk-related information and are not prepared and stored ...
A probabilistic schedule delay analysis in construction projects by using fuzzy logic incorporated with relative importance index (RII) method
Özdemir, Mustafa; Gündüz, Murat; Department of Civil Engineering (2010)
The aim of this thesis is to propose a decision support tool for contractors before the bidding stage to quantify the probability of schedule delay in construction projects by using fuzzy logic incorporated with relative importance index (RII) method. Eighty three (83) different schedule delay factors were identified through detailed literature review and interview with experts from a leading Turkish construction company, then categorized into nine (9) groups and visualized by utilizing Ishikawa (Fish Bone)...
An Integrated regression-bootstrap sampling scheduling method for probabilistic duration range estimation of construction projects
Barış, Özgür; Sönmez, Rifat; Department of Civil Engineering (2019)
The estimation of project duration is important in construction projects, since it directly affects the costs and the success of the projects. Schedule risks can be determined along with the duration estimations in order to assess the possibility of delay penalties and additional costs. Therefore, the accuracy of the estimation of project duration range is very crucial in construction industry to assess the schedule risks. This thesis presents an integrated approach of non-parametric bootstrap sampling meth...
Analogical reasoning for risk assessment and cost overrun estimation in construction projects
Çelenligil, Onur; Dikmen Toker, İrem; Birgönül, Mustafa Talat; Department of Civil Engineering (2010)
Project cost increase is the main concern in international construction projects which usually results in disputes and conflicts among the project participants. The aim of this thesis is to construct a database that represents risk event history regarding international construction projects and construct a cost overrun prediction model. It is hypothesized that magnitudes of project related, company related and country related risk factors can be predicted by assessing the level of vulnerability by analogica...
Smart contract systems for guaranteed and timely payment of construction projects
Ahmadisheykhsarmast, Salar; Sönmez, Rifat; Department of Civil Engineering (2020)
Delay in progress payment is a widespread problem in the construction industry which adversely affects the entire processes of the projects. Difficulties in the cashflow of the contracts, and consequently the subcontractors are the main consequences of delayed payments. Despite its significance, few research focused on development of methods guaranteeing timely payments of the participants throughout the project. Recent developments in blockchain and smart contract technologies presents a potential for deve...