Integrating a Meta-Heuristic Method into Microsoft Project for Time-Cost Trade-off Analyses

2018-11-16
Amınbakhsh, Saman
Sönmez, Rifat
Aminbakhsh, Sina
Atan, Tankut
Citation Formats
S. Amınbakhsh, R. Sönmez, S. Aminbakhsh, and T. Atan, “Integrating a Meta-Heuristic Method into Microsoft Project for Time-Cost Trade-off Analyses,” 2018, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/82138.