A decentralized structure to reduce and resolve construction disputes in a hybrid blockchain network

2022-02-01
Saygili, Murathan
Mert, Isa Emre
Tokdemir, Onur Behzat
Disputes routinely arise in construction projects, and they have major cost and schedule impacts. Therefore, they need to be either prevented effectively by proper contract and payment execution or resolved efficiently with enhanced resolution processes regarding cost, duration, effort, and transparency. However, current practices are inadequate for both effectiveness and efficiency since they mainly depend on centralized authority. This paper is designed in two folds; first, a generic blockchain-based online dispute resolution platform is tested with two litigation cases collected in 1999 and 2009 to show the need for a construction-focused system. Then, a new construction-specific framework, Decentralized Construction Enabling Transparent Resolution (DCENTR), is proposed to address the unique nature of construction projects. Ultimately, it is shown that dispute likelihood can be minimized through reliable contract and payment execution, and if occurred, construction disputes can be resolved with higher transparency and dramatic savings in effort, time, and cost.
AUTOMATION IN CONSTRUCTION

Suggestions

A Hybrid genetic algorithm for multi mode resource constrained scheduling problem for large size projects
Gürel, Mustafa; Sönmez, Rifat; Department of Civil Engineering (2015)
Just like in all industries, some of the available resources, in order to finish a project on time, are constrained in construction industry. To be able to finish the project on time has high importance both for the contractor and for the owner. Project scheduling in which resources are limited for a particular time are called as resource constrained project scheduling problems (RCPSP) and occupies a significant place in construction management. Especially for large scale projects, little success has been a...
An Integrated regression-bootstrap sampling scheduling method for probabilistic duration range estimation of construction projects
Barış, Özgür; Sönmez, Rifat; Department of Civil Engineering (2019)
The estimation of project duration is important in construction projects, since it directly affects the costs and the success of the projects. Schedule risks can be determined along with the duration estimations in order to assess the possibility of delay penalties and additional costs. Therefore, the accuracy of the estimation of project duration range is very crucial in construction industry to assess the schedule risks. This thesis presents an integrated approach of non-parametric bootstrap sampling meth...
A Causal mapping approach for the analysis of construction disputes
Tanrıverdi, Cenk; Dikmen Toker, İrem; Department of Civil Engineering (2019)
Containing various work disciplines, numerous stakeholders, and relatively extensive procedures due to its nature, disputes are frequently encountered in construction projects. The fact that disputes can have devastating effects on success of projects in terms of both time and cost to both parties involved when not dealt with care, makes a clear understanding of how and why disputes occur in construction projects an important research topic. Previous studies on this subject has mostly yielded only exhaustiv...
A comparative study of regression analysis, neural networks and case-based reasoning for early range cost estimation of mass housing projects
Karancı, Hüseyin; Sönmez, Rifat; Department of Civil Engineering (2010)
Construction cost estimating is essential for all of the stakeholders of a construction project from the beginning stage to the end. At early stages of a construction project, the design information and scope definition are very limited, hence; during conceptual (early) cost estimation, achieving high accuracy is very difficult. The level of uncertainty included in the cost estimations should be emphasized for making correct decisions throughout the dynamic stages of construction project management process,...
A Comparative study on direct analysis method and effective length method in one-story semi-rigid frames
Bektaş, Şinasi; Birgönül, Mustafa Talat; Department of Civil Engineering (2012)
Many factors such as unforeseeable events, managerial or financial problems of Contractor, insufficient technical capacity of Engineer's site team and so on may lead to delays in construction projects. Proper analysis of compensability and quantum of a delay event is very important. Any delay analysis application can be considered as a result of the combination of contract documents, scheduler, record keeping mechanism at site, communication among project participants, delay analyst and delay analysis metho...
Citation Formats
M. Saygili, I. E. Mert, and O. B. Tokdemir, “A decentralized structure to reduce and resolve construction disputes in a hybrid blockchain network,” AUTOMATION IN CONSTRUCTION, vol. 134, pp. 0–0, 2022, Accessed: 00, 2022. [Online]. Available: https://hdl.handle.net/11511/95269.