Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Resource-constrained project scheduler
Download
053397.pdf
Date
1996
Author
Kara, Yılmaz
Metadata
Show full item record
Item Usage Stats
44
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/9889
Collections
Graduate School of Social Sciences, Thesis
Suggestions
OpenMETU
Core
Resource-aware load balancing system with artificial neural networks
Yıldız, Ali; Şener, Cevat; Department of Computer Engineering (2006)
As the distributed systems becomes popular, efficient load balancing systems taking better decisions must be designed. The most important reasons that necessitate load balancing in a distributed system are the heterogeneous hosts having different com- puting powers, external loads and the tasks running on different hosts but communi- cating with each other. In this thesis, a load balancing approach, called RALBANN, developed using graph partitioning and artificial neural networks (ANNs) is de- scribed. The ...
Resource management in callular communication networks with subscriber profile prediction
Yılmaz, Nusrat; Ergül, Rüyal; Department of Electrical and Electronics Engineering (2005)
In this study, a dynamic resource management and subscriber profile prediction scheme for mobile communication systems is presented. The aim is to achieve a high level of QoS for both handoff calls and new calls, while at the same time to improve the utilization of wireless network resources. The simultaneous satisfaction of these two actually conflicting interests will be thanks to two major key features. First, it will be due to the individual subscriber profile based prior information about handoff reser...
Resource sharing and distributed services for local area networks
Selbes, Haydar; Tolun, Mehmet R.; Department of Computer Engineering (1988)
Project Cost Benefit and Risk Analysis using Bayesian Networks
Yet, Barbaros; Fenton, Norman; Neil, Martin; Luedeling, Eike; Shepherd, Keith (null; 2015-07-16)
Uncertainty and risks are common elements of all major projects. Yet such uncertainty is rarely effectively calculated when analysing project costs and benefits. This paper presents a Bayesian network (BN) modelling framework to calculate the costs, benefits, and return on investment of a project over a specified time period, allowing for changing circumstances and trade-offs. The framework uses hybrid and dynamic BNs containing both discrete and continuous variables over multiple time stages. The BN calcul...
Resource management in cellular communication networks with subscriber profile prediction
Yilmaz, N; Ergul, R (2004-09-09)
in this paper, a dynamic resource management and subscriber profile prediction scheme for mobile communication systems is presented. Using this approach, a high level of QoS for both handoff calls and new calls, and better utilization of wireless network resources has been achieved. The simultaneous satisfaction of these two actually conflicting interests will be due to two key features. First, it is due to the subscriber profile predicted using subscriber data. This apriori information about possible hando...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
Y. Kara, “Resource-constrained project scheduler,” Middle East Technical University, 1996.