Firm-sponsored training, technical progress and aggregate performance in a micro-macro model

1996-01-01
Ballot, G
Taymaz, Erol
IARIW Special Conference on Microsimulation and Public Policy

Suggestions

Firm growth dynamics and employment generation in the Turkish manufacturing industry
TÖNGÜR, ÜNAL; Taymaz, Erol (2019-01-01)
Firm Growth Dynamics and Employment Generation in Turkish Manufacturing
Taymaz, Erol (Routledge, 2019-01-01)
Manufacturing flexibility: conceptualization and measurement
Kahyaoğlu, Yasemin; Kayalıgil, Sinan; Department of Operations Research (1998)
Aggregate production planning and material requirements planning systems design for an electronics company
Türeç, Ayşe; Kırca, Ömer; Department of Electrical Engineering (1991)
Firm energy production optimization and monthly operation of multi-reservoir hydroelectric systems.
Uran, M. Ayhan; Department of Civil Engineering (1980)
Citation Formats
G. Ballot and E. Taymaz, “Firm-sponsored training, technical progress and aggregate performance in a micro-macro model,” Canberra, Avustralya, 1996, vol. 232, Accessed: 00, 2022. [Online]. Available: https://hdl.handle.net/11511/99917.