Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Public R &D project portfolio selection under expenditure uncertainty
Date
2023-01-01
Author
Çağlar, Musa
Gürel, Sinan
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
88
views
0
downloads
Cite This
We consider a project portfolio selection problem faced by research councils in project and call-based R &D grant programs. In such programs, typically, each applicant project receives a score value during specially-designed peer review processes. Each project also has a certain budget, estimated by its principle investigator. The problem is to select an optimal (maximum total score) subset of applicant projects under a budget constraint for the call. At the time of funding decisions, exact expenditures of projects are not known. The research councils typically don’t provide more money than they funded a project to start with, so the realized total expenditure of a portfolio usually tends to be lower than the total budget, which causes budgetary slack. In this paper, we attempt to model this phenomenon in a project portfolio selection problem and show that budget utilization of a call can be increased to support more projects and hence achieve higher scientific impact. We model a project’s expenditure using a mixture distribution that represents project success, underspending and cancellation situations. We develop a chance-constrained model with policy constraints. Due to the intractability of the developed model, we have shown that Normal distribution can be used for approximation. We also quantify the approximation error of our model via a theoretical bound and simulation. The proposed approach could rigorously increase the budget utilization up to 15.2% along with a prominent rise in expected number of successfully completed projects, which are remarkable metrics for public decision makers.
Subject Keywords
Chance constrained optimization
,
Data analytics
,
Expenditure uncertainty
,
Project portfolio selection
,
Simulation
URI
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85175263957&origin=inward
https://hdl.handle.net/11511/106116
Journal
Annals of Operations Research
DOI
https://doi.org/10.1007/s10479-023-05638-2
Collections
Department of Industrial Engineering, Article
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. Çağlar and S. Gürel, “Public R &D project portfolio selection under expenditure uncertainty,”
Annals of Operations Research
, pp. 0–0, 2023, Accessed: 00, 2023. [Online]. Available: https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85175263957&origin=inward.