Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Determination of Minimum Intermediary Hold Durations in Multistage First-Filling Schedule of Earth-Fill Dam Reservoirs
Date
2024-05-01
Author
Kurter, Ege Can
Çalamak, Melih
Yanmaz, Ali Melih
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
81
views
0
downloads
Cite This
Earth-fill dams should be monitored during the first filling of the reservoir to avoid several potential risks. Following the completion of dam construction, the primary safety check is monitoring the dam behavior during the first interaction of the earth material with water. The presented work fills the gap in the literature on the determination of intermediary hold durations of multistage filling schedule and provides insights into the first-filling process. The study investigated the behavior of a 20 m high earth-fill dam model subjected to staged reservoir filling. The durations of the intermediary holds were determined based on coupled stress and pore water pressure analyses using the finite-element method, with a particular emphasis on the transient behavior of the filling process. Hydraulic fracturing and internal erosion possibilities were evaluated based on minimum principal stress and seepage quantities at critical sections. It was observed that the minimum principal stress reaches a local minimum and tends to increase, leading to significant convergence for longer hold alternatives. In addition, seepage quantities exhibited similar behavior of decreasing with longer hold durations. A specific hold duration was recommended for the low-pool level, which resulted in a hold-to-height ratio of 2.35. At the high-pool level, it was found that further waiting has a positive effect in mitigating the risk of hydraulic fracturing and internal erosion initiation. The presented practical methodology is proposed to be used for the design of filling schedules of new dams.
URI
https://hdl.handle.net/11511/109657
Journal
INTERNATIONAL JOURNAL OF GEOMECHANICS
DOI
https://doi.org/10.1061/ijgnai.gmeng-9733
Collections
Department of Civil Engineering, Article
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
E. C. Kurter, M. Çalamak, and A. M. Yanmaz, “Determination of Minimum Intermediary Hold Durations in Multistage First-Filling Schedule of Earth-Fill Dam Reservoirs,”
INTERNATIONAL JOURNAL OF GEOMECHANICS
, vol. 24, no. 7, pp. 40241351–402413510, 2024, Accessed: 00, 2024. [Online]. Available: https://hdl.handle.net/11511/109657.