Construction of the university time tables by computer.

1974
Gönç, Bülent

Suggestions

Construction of a test set-up for experimental evaluation of refrigerator condensers.
Okutucu, Tuba; Oskay, Rüknettin; İleri,Arif; Department of Mechanical Engineering (1999)
Construction of quality control charts with sub-optimal size samples
Ozilgen, M (1998-02-01)
A case study is presented for construction of the quality control charts with suboptimum size samples obtained in a commercial brewery after measuring total acidity, apparent extract and pH of the wort; alcohol, real extract, carbon dioxide total acidity and pH of the bottled beer. Logarithmic transformation of the data was employed to construct the quality control charts, and centering of the data between the specification limits was assessed by means of the process capability index values.
Construction of a New Multi-technique Helium Diffraction System
Danışman, Mehmet Fatih; Bracco, Gianangelo (null; 2017-10-22)
Design of a meteorological wind tunnel.
Baykut, Ayfer; Department of Civil Engineering (1975)
Design of a general purpose computerized quality control system.
Aktürk, Mehmet Selim; Department of Industrial Engineering (1984)
Citation Formats
B. Gönç, “Construction of the university time tables by computer.,” Middle East Technical University, 1974.