Heuristics for Multi-Item Two-Echelon Spare Parts Inventory Control Problem with Batch Ordering in the Central Warehouse

2009-06-28
Tan, Tarkan
Topan, Engin
Bayındır, Zeynep Pelin

Suggestions

Heuristics for operational fixed job scheduling problems with working and spread time constraints
Eliiyi, Deniz Tursel; Azizoğlu, Meral (Elsevier BV, 2011-07-01)
Operational fixed job scheduling problems select a set of jobs having fixed ready and processing times and schedule the selected jobs on parallel machines so as to maximize the total weight. In this study, we consider working time and spread time constrained versions of the operational fixed job scheduling problems. The working time constraints limit the total processing load on each machine. The spread time constraints limit the time between the start of the first job and the finish of the last job on each...
Heuristic procedures for the lot sizing problem with assembly structures
İrfanoğlu, Orhan; Kırca, Ömer; Department of Industrial Engineering (1990)
Heuristics for Dynamic Scheduling of Multi-Class Base-Stock Controlled Systems
Kat, Bora; Avşar, Zeynep Müge (2005-05-20)
Dynamic scheduling of an exponential single-server facility processing different types of items one by one is studied for the case of Poisson demand arrivals. Inventories of the items are managed by base-stock policies and backordering is allowed. Structure of the optimal scheduling policy is investigated numerically with respect to a weighted average of the fill rates. Performance of the optimal policy is compared to those of two well-known policies, Longest Queue and First-Come-First-Served, and alternati...
Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures
Topan, Engin; Bayındır, Zeynep Pelin; Tan, Tarkan (Elsevier BV, 2017-01-01)
We consider a multi-item two-echelon spare parts inventory system in which the central warehouse operates under a (Q, R) policy and local warehouses implement (S-1,S) policy. The objective is to find the policy parameters minimizing expected system-wide inventory holding and fixed ordering subject to aggregate and individual response time constraints. Using an exact evaluation we provide a very efficient and effective heuristic, and also a tight lower bound for real-world, large-scale two-echelon spare part...
Heuristic procedures for multi-item dynamic lot sizing problem with set-up times
Uluöz, B Deniz; Kırca, Ömer; Department of Industrial Engineering (1988)
Citation Formats
T. Tan, E. Topan, and Z. P. Bayındır, “Heuristics for Multi-Item Two-Echelon Spare Parts Inventory Control Problem with Batch Ordering in the Central Warehouse,” 2009, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/71621.