Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Design, construction , and calibration of aa water tunnel.
Date
1976
Author
Ansari, M K Jahaanqeer
Metadata
Show full item record
Item Usage Stats
77
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/7833
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
Design and construction of a capillary limited heat pipe.
Boratav, N. Oluş; Department of Mechanical Engineering (1984)
Design , construction and testing of a stroke regulated pressure compensator with a seperate control circuit.
Akın, Cengiz; Department of Mechanical Engineering (1979)
Design and construction of a rapier drive system.
Tiniş, Fuat; Department of Mechanical Engineering (1983)
Design and construction of an axial flow research compressor.
Hatip, Ömer Etka; Department of Mechanical Engineering (1985)
Design and construction of a pulse amplitude modulated inverter.
Ulusoy, Ali; Department of Electrical Engineering (1974)
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. K. J. Ansari, “Design, construction , and calibration of aa water tunnel.,” Middle East Technical University, 1976.