Credit Analysis of construction companies

Download
1998
Bodur, Çağlayan Şerif

Suggestions

Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
Tokdemir, Onur Behzat; Dikmen Toker, İrem (American Society of Civil Engineers (ASCE), 2019-02-01)
Although the line-of-balance (LOB) method is widely used for the scheduling of repetitive construction projects, there are only a limited number of studies that deal with the issue of how to incorporate uncertainty in repetitive schedules. In this paper, a delay risk assessment method is proposed for projects scheduled by LOB. In the proposed method, a LOB schedule is prepared considering the target rate of delivery, and then risk scenarios are defined considering the sources of uncertainty and vulnerabilit...
PERFORMANCE IMPROVEMENT FOR SITUATIONAL AWARENESS AND RESTORATION OF DISTRIBUTION SYSTEMS
Yılmaz, Uğur Can; Göl, Murat; Department of Electrical and Electronics Engineering (2021-6-30)
Electricity has a crucial role in modern life, and its absence may cause catastrophic complications. Restoration of distribution systems requires an efficient decision support mechanism as well as an accurate real-time operation. Considering the utmost importance of fast restoration of the distribution system to provide uninterrupted electricity, a decision support mechanism is required to employ an efficient analysis of the system. Therefore, it is crucial to analyze the system in a fast manner. This thesi...
Uncertainty Analysis of Heat Transfer Predictions Using Statistically Modeled Data From a Cooled 1-1/2 Stage High-Pressure Transonic Turbine
Kahveci, Harika Senem (ASME International, 2014-06-01)
This paper compares predictions from a 3D Reynolds-averaged Navier-Stokes code and a statistical representation of measurements from a cooled 1-1/2 stage high-pressure transonic turbine to quantify predictive process sensitivity. A multivariable regression technique was applied to both the inlet temperature measurements obtained at the inlet rake, the wall temperature, and heat transfer measurements obtained via heat-flux gauges on the blade airfoil surfaces. By using the statistically modeled temperature p...
Pseudo-Dynamic Testing, Performance Assessment, and Modeling of Deficient Reinforced Concrete Frames
Sucuoğlu, Haluk; Binici, Barış (2014-09-01)
A pair of half-scale, three-story, three-bay concrete bare frames were tested by the pseudo-dynamic (PsD) testing procedure. Both frames represent common deficiencies. of non-seismic construction. Continuous column reinforcement in one specimen and insufficient lap splices at the bottom ends of columns in the other specimen were the only significant differences. Measured seismic performances of both frames were assessed by using the rotation and strain-based acceptance criteria of two different seismic code...
Systemic seismic vulnerability and risk analysis for buildings, lifeline networks and infrastructures safety gain (SYNER-G)
Yakut, Ahmet(2013)
SYNER-G is research project which has the following main goals: (1) To elaborate appropriate, in the European context, fragility relationships for the vulnerability analysis and loss estimation of all elements at risk, for buildings, building aggregates, utility networks (water, waste water, energy, gas), transportation systems (road, railways, harbors) as well as complex medical care facilities (hospitals) and fire-fighting systems. (2) To develop social and economic vulnerability relationships for quantif...
Citation Formats
Ç. Ş. Bodur, “Credit Analysis of construction companies,” Middle East Technical University, 1998.