Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Pre-Positioning Disaster Response Facilities and Relief Items
Date
2015-07-04
Author
RENKLİ, Cigdem
Duran, Serhan
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
263
views
0
downloads
Cite This
Large-scale disasters cause enormous damage to people living in the affected areas. Providing relief quickly to the affected is a critical issue in recovering the effects of a disaster. Pre-disaster planning has an important role on reducing the arrival time of relief items to the affected areas and efficiently allocating them. In this study, a mixed integer programming model is proposed in order to pre-position warehouses throughout a potential affected area and determine the amount of relief items to be held in those warehouses. Time between the strike of the disaster and arrival of relief items at the affected areas is aimed to be minimized. In addition, using probabilistic constraints, the model ensures that relief items arrive at affected areas within a certain time window with certain reliability. Considering instable fault lines on which Istanbul is located, the proposed model is applied to the Istanbul case for pre-positioning warehouses a priori to the possible expected large-scale earthquake.
Subject Keywords
Humanitarian logistics
,
Mixed integer programming
,
Probabilistic constraints
,
Disaster management
URI
https://hdl.handle.net/11511/35650
Journal
HUMAN AND ECOLOGICAL RISK ASSESSMENT
DOI
https://doi.org/10.1080/10807039.2014.957940
Collections
Department of Industrial Engineering, Article
Suggestions
OpenMETU
Core
Pre-positioning disaster response facilities and relief items considering probabilistic constraints : a case study on istanbul region
Renkli, Çiğdem; Duran, Serhan; Department of Industrial Engineering (2013)
Large-scale disasters cause enormous damage to people living at the aff ected areas. Providing relief quickly to the aff ected is a critical issue in recovering the eff ects of a disaster. Predisaster planning has an important role on reducing the arrival time of relief items to the a ffected areas and effi ciently allocating the them. In this study, an MIP model is proposed in order to pre-position warehouses throughout an a ffected area and determine the amount of relief items to be held in those warehous...
Broadband ground motion simulation within Duzce city (Turkey)
Özmen, Ekin; Askan Gündoğan, Ayşegül; Kestel, Sevtap Ayşe; Department of Earthquake Studies (2019)
Earthquakes have more hazardous and devastating effects in populated areas. To prevent damage and reduce the risks, broadband records are collected to use in the seismic hazard assessment and engineering seismology. In areas with significant seismic activity and insufficient seismic networks, the simulated ground motions become more important. Broadband ground motion simulations are performed for 12 November 1999 Duzce earthquake. Deterministic simulations are performed for low frequency part and stochastic...
Advancement of Satellite Rainfall Applications for Hydrologic Modeling with Emphasis on Flood Monitoring (FLOODSAT)
Yılmaz, Koray Kamil(2014-3-31)
"Floods are the most widespread and frequent natural disaster responsible for significant loss of lives and property each year. The European Environmental Agency estimated that floods in Europe between 1998 and 2002 caused about 700 deaths, the displacement of about half a million people and at least 25 billion Euros in insured economic losses. As such, one of the four priority areas in FP7 has been identified as triggering factors and forecasting and mitigation strategies for natural hazards. Flood early ...
An Optimization-Based Decision-Support Tool for Post-Disaster Debris Operations
Lorca, Alvaro; Çelik, Melih; Ergun, Ozlem; Keskinocak, Pinar (2017-06-01)
Debris generated by disasters can hinder relief efforts and result in devastating economic, environmental, and health problems. In this study, we present a decision-support tool employing analytical models to assist disaster and waste management officials with decisions regarding collection, transportation, reduction, recycling, and disposal of debris. The tool enables optimizing and balancing the financial and environmental costs, duration of the collection and disposal operations, landfill usage, and the ...
Pre-positioning of relief items under road/facility vulnerability with concurrent restoration and relief transportation
Aslan, Ece; Çelik, Melih (2019-08-03)
Planning for response to sudden-onset disasters such as earthquakes, hurricanes, or floods needs to take into account the inherent uncertainties regarding the disaster and its impacts on the affected people as well as the logistics network. This article focuses on the design of a multi-echelon humanitarian response network, where the pre-disaster decisions of warehouse location and item pre-positioning are subject to uncertainties in relief item demand and vulnerability of roads and facilities following the...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
C. RENKLİ and S. Duran, “Pre-Positioning Disaster Response Facilities and Relief Items,”
HUMAN AND ECOLOGICAL RISK ASSESSMENT
, pp. 1169–1185, 2015, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/35650.