Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Capacitated Two-Indenture Models for Repairable Item Systems
Download
index.pdf
Date
2003-01-01
Author
ZİJM, Henk
Avşar, Zeynep Müge
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
166
views
129
downloads
Cite This
A two-indenture maintenance system is considered for a number of identical installations, in use at a single site. The installations are considered as assemblies that are made up of a number of repairable components. A component repair center and an assembly facility are both modeled as product form queuing networks. Failures of the assemblies occur according to a Poisson process. There are stock points for both ready-for-use assemblies and components. The inventory control policy employed at each stock point is a base-stock policy. Upon failure of an assembly, it is replaced by a ready-for-use one, if available. The failed assembly is inspected to identify and disassemble the broken component causing its failure. Next, the broken component is sent to the component repair center and one ready-for-use component is requested from the stock of this component. Once a ready-for-use component is available for the assembly, the request and the available component are merged and sent to the assembly facility. Completion of a component repair or an assembly operation results in a replenishment of the corresponding stock point. Requests that cannot be satisfied right away are backordered. Service discipline is first-come-first-serve at each facility. Assuming that only one component is identified at a time as the cause of an assembly failure, first an alternative slightly aggregated (but exact) formulation is given for the system and then a near-product-form solution is proposed as an approximate steady-state distribution of the aggregated system. Comparison of the approximate performance measures computed with the use of the near-product-form solution and the ones obtained with simulation shows that the approximation is quite accurate. Relying on the accuracy, approximate performance measures are used for optimizing base-stock levels with a greedy procedure.
Subject Keywords
Management Science and Operations Research
,
Economics and Econometrics
,
Industrial and Manufacturing Engineering
,
General Business, Management and Accounting
URI
https://hdl.handle.net/11511/37868
Journal
International Journal Of Production Economics
DOI
https://doi.org/10.1016/s0925-5273(02)00360-2
Collections
Department of Industrial Engineering, Article
Suggestions
OpenMETU
Core
Part-mix allocation between automated and conventional manufacturing
KAYALlGIL, M. SINAN (Informa UK Limited, 1990-10)
The overall part-mix of a production system is allocated optimally between the existing conventional facilities and planned automated system to be acquired. Approximate mean value analysis (MVA) is utilized to evaluate performance of the automated system under trial part-mix allocations. Cost of processing and WIPs are taken as the sources of operational costs. Cost minimizing route allocations when alternatives exist are handled by a search procedure.
Dissimilarity maximization method for real-time routing of parts in random flexible manufacturing systems
Saygin, C; Kilic, SE (Springer Science and Business Media LLC, 2004-04-01)
This paper presents a dissimilarity maximization method (DMM) for real-time routing selection and compares it via simulation with typical priority rules commonly used in scheduling and control of flexible manufacturing systems (FMSs). DMM aims to reduce the congestion in the system by selecting a routing for each part among its alternative routings such that the overall dissimilarity among the selected routings is maximized. In order to evaluate the performance of DMM, a random FMS, where the product mix is...
Integrated framework to investigate value innovations
Dikmen Toker, İrem; Birgönül, Mustafa Talat (American Society of Civil Engineers (ASCE), 2005-04-01)
A conceptual framework has been developed to investigate value innovations within construction companies. A visual metaphor has been defined to model the innovation system where the elements of the model are objectives, strategies, environmental barriers/drivers, and organizational factors. The major idea is that none of the elements of the model alone can explain the innovative capability, and elements as well as their interrelations should be considered concurrently to investigate how the innovation syste...
Comparison of Intelligent Classification Techniques by Practicing a Specific Technology Audit
Berkol, A.; Kara, G.; Turk, A. (2016-09-08)
Technology audit activities arc carried out for assessment of firms' technological requirements, capacity or management capability. The aim of these assessments is to define the weaknesses of firms and develop actions in order to improve firms' technological capacity and/or technology management capability. Generally these activities are implemented with survey questionnaires. These questionnaires can be filled by managers of firms or can be implemented as an interview by independent experts. However, evalu...
Joint optimization of ordering and maintenance with condition monitoring data
Moghaddass, Ramin; Ertekin Bolelli, Şeyda (Springer Science and Business Media LLC, 2018-04-01)
We study a single-unit deteriorating system under condition monitoring for which collected signals are only stochastically related to the actual level of degradation. Failure replacement is costlier than preventive replacement and there is a delay (lead time) between the initiation of the maintenance setup and the actual maintenance, which is closely related to the process of spare parts inventory and/or maintenance setup activities. We develop a dynamic control policy with a two-dimensional decision space,...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
H. ZİJM and Z. M. Avşar, “Capacitated Two-Indenture Models for Repairable Item Systems,”
International Journal Of Production Economics
, pp. 573–588, 2003, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/37868.