Scheduling a batch processing machine with non-identical job sizes

2000-07-10
The problem of scheduling batch processors is important in some industries and, at a more fundamental level, captures an element of complexity common to many practical scheduling problems. We describe a branch and bound procedure applicable to a batch processor model with arbitrary job processing times, job weights and job sizes. The scheduling objective is to minimize total weighted completion time. We find that the procedure returns optimal solutions to problems of up to similar to 25 jobs in reasonable CPU time, and can be adapted for use as a heuristic for larger problems.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH

Suggestions

Scheduling a batch processing machine with incompatible job families
Azizoğlu, Meral (2001-04-01)
The problem of scheduling batch processors is important in some industries and, at a more fundamental level, captures an element of complexity common to many practical scheduling problems. We describe a branch and bound procedure applicable to a batch processor model with incompatible job families. Jobs in a given family have identical job processing times, arbitrary job weights, and arbitrary job sizes. Batches are limited to jobs from the same family. The scheduling objective is to minimize total weighted...
Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
Azizoğlu, Meral; Kirca, O (1999-02-01)
In this paper we consider unrelated parallel machine scheduling problems that involve the minimization of regular total cost functions. We first present some properties of optimal solutions and then provide a lower bound. These mechanisms are tested on the well-known practical problem of minimizing total weighted flow time on unrelated parallel machines. In doing so, we design a branch and bound algorithm incorporating the mechanisms derived for the general total cost function along with the ones derived sp...
Preemptive scheduling on identical parallel machines subject to deadlines
Azizoğlu, Meral (2003-07-01)
We consider the problem of scheduling n preemptive jobs with deadlines on in identical parallel machines so as to minimize total completion time. We show that the problem is polynomially solvable when the processing times and deadlines are agreeable.
Parallel flow shop schedulİng wİth common workstatİons
Çakıcı, Muhammet Kemal; Meral, Fatma Sedef; Department of Industrial Engineering (2019)
In this thesis, we address the parallel flow shop scheduling problem with common workstations to minimize the makespan, considering the flow shop design defined solely by the number of operators at the workstations. We are motivated by the production environment of a compressor manufacturing company located in Konya, Turkey. Different from the similar studies in the literature, we use common workstations at some of the stages, prefer to place limited buffer areas between the stages, and do not allow for job...
Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem
Uysal, Furkan; Sönmez, Rifat; Department of Civil Engineering (2014)
The general resource constrained multi-project scheduling problem (RCMPSP) consists of simultaneous scheduling of two or more projects with common resource constraints, while minimizing duration of the projects. Critical Path Method and other scheduling methods do not consider resource conflicts and practically used commercial project management software packages and heuristic methods provide very limited solutions for the solution of the RCMPSP. Considering the practical importance of multi-project schedul...
Citation Formats
M. Azizoğlu, “Scheduling a batch processing machine with non-identical job sizes,” INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, pp. 2173–2184, 2000, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/40657.