Scheduling a batch processing machine with non-identical job sizes

2000-07-10
The problem of scheduling batch processors is important in some industries and, at a more fundamental level, captures an element of complexity common to many practical scheduling problems. We describe a branch and bound procedure applicable to a batch processor model with arbitrary job processing times, job weights and job sizes. The scheduling objective is to minimize total weighted completion time. We find that the procedure returns optimal solutions to problems of up to similar to 25 jobs in reasonable CPU time, and can be adapted for use as a heuristic for larger problems.
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH

Suggestions

Scheduling a batch processing machine with incompatible job families
Azizoğlu, Meral (2001-04-01)
The problem of scheduling batch processors is important in some industries and, at a more fundamental level, captures an element of complexity common to many practical scheduling problems. We describe a branch and bound procedure applicable to a batch processor model with incompatible job families. Jobs in a given family have identical job processing times, arbitrary job weights, and arbitrary job sizes. Batches are limited to jobs from the same family. The scheduling objective is to minimize total weighted...
Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
Azizoğlu, Meral; Kirca, O (1999-02-01)
In this paper we consider unrelated parallel machine scheduling problems that involve the minimization of regular total cost functions. We first present some properties of optimal solutions and then provide a lower bound. These mechanisms are tested on the well-known practical problem of minimizing total weighted flow time on unrelated parallel machines. In doing so, we design a branch and bound algorithm incorporating the mechanisms derived for the general total cost function along with the ones derived sp...
Preemptive scheduling on identical parallel machines subject to deadlines
Azizoğlu, Meral (2003-07-01)
We consider the problem of scheduling n preemptive jobs with deadlines on in identical parallel machines so as to minimize total completion time. We show that the problem is polynomially solvable when the processing times and deadlines are agreeable.
Parallel flow shop schedulİng wİth common workstatİons
Çakıcı, Muhammet Kemal; Meral, Fatma Sedef; Department of Industrial Engineering (2019)
In this thesis, we address the parallel flow shop scheduling problem with common workstations to minimize the makespan, considering the flow shop design defined solely by the number of operators at the workstations. We are motivated by the production environment of a compressor manufacturing company located in Konya, Turkey. Different from the similar studies in the literature, we use common workstations at some of the stages, prefer to place limited buffer areas between the stages, and do not allow for job...
Uniform Parallel machine scheduling with family set-up times
Tamer, Meral; Azizoğlu, Meral; Azizoğlu, Meral; Department of Industrial Engineering (2003)
In this study, we address the scheduling problem of uniform parallel machines with family set-up times so as to minimize the total completion time. We develop a branch and jound algorithm that employs an efficient branching scheme. A bounding mechanism is jroposed to increase the efficiency of this algorithm. Our computational experiment shows hat the optimal solution is found in reasonable CPU times up to 15 jobs. Further experiments »re conducted to test the bounding mechanisms and this experiment indicat...
Citation Formats
M. Azizoğlu, “Scheduling a batch processing machine with non-identical job sizes,” INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, pp. 2173–2184, 2000, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/40657.