Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Application of an Integrated risk management system (IRMS) to an international construction project
Date
2006-09-06
Author
Dikmen Toker, İrem
Birgönül, Mustafa Talat
Metadata
Show full item record
Item Usage Stats
119
views
0
downloads
Cite This
Integrated Risk Management System (IRMS) is a decision support tool designed to support users at all phases of risk management and to assist cost estimation in the bid preparation stage, especially in international construction projects. IRMS process model consists of four integrated phases such as risk identification, risk rating and response development, risk analysis, and finally, risk revising and monitoring. A hierarchical risk breakdown structure is provided in the system which facilitates systematic risk identification process. Risk coding option embedded in the system creates a common language between the project participants. IRMS carries out an iterative risk rating and response generation process as an input for Monte Carlo Simulation. Moreover, IRMS is designed to store and retrieve risk information from a corporate memory that helps learning from projects. IRMS also allows multi-user risk rating. It increases the awareness of project participants on the magnitude of risks and helps visualization of risk scenarios by its effective reporting options. It can be used throughout the project life cycle and risk scenarios can be revised as the project proceeds. In this paper, application of IRMS prototype is illustrated by a real case study. The example project is a hydro electric power plant project (HEPP) which has been carried out by an international consortium in Turkey. Performance, shortcomings and benefits of IRMS are discussed by referring to experiences gained as a result of this application.
URI
https://hdl.handle.net/11511/88264
Conference Name
ARCOM 2006, (4 - 06 Eylül 2006)
Collections
Department of Civil Engineering, Conference / Seminar
Suggestions
OpenMETU
Core
Development of a risk management decision support system for intarnational construction projects
Arıkan, Arif Erdem; Dikmen Toker, İrem; Department of Civil Engineering (2005)
It is agreed upon by many researchers that, although risk management (RM) is accepted as one of the critical success factors for construction projects, project participants generally do not have sufficient knowledge pertinent to risk management concept and the number of risk management support tools which facilitate the process is rather low. In order to facilitate risk management activities, decision support tools that will enable risk identification, analysis and response strategy formulation should be de...
Mapping Uncertainty for Risk and Opportunity Assessment in Projects
Qazi, Abroon; Dikmen Toker, İrem; Birgönül, Mustafa Talat (Informa UK Limited, 2019-01-01)
Risk management is deemed as a critical process toward achieving the objectives of any project. A number of tools and techniques have been developed to help project managers reduce the risk involved in complex projects as risk is generally perceived as a negative event. However, uncertainty, which may lead to risk events may well result in opportunities. With the main aim of managing both risk and opportunity within an interdependent setting of interacting project uncertainties, we present a new thinking, c...
A Decision Support System for Project Portfolio Management in Construction Companies
Bilgin, Gozde; Dikmen Toker, İrem; Birgönül, Mustafa Talat; ÖZORHON ORAKÇAL, BELİZ (2022-11-01)
Project portfolio management requires a systematic process that comprises assessment of portfolio risk and expected profitability, as well as strategic fit of individual projects with company objectives. After a needs analysis based on literature findings and surveys with experts, in this study, a process model and a tool, COPPMAN (COnstruction Project Portfolio MANagement), were developed to support project portfolio decisions in construction companies. COPPMAN was developed in collaboration with construct...
Application of risk management process on wave propagation in aerospace medium
Konukcu, Selda; Tulunay, Yurdanur; Department of Aerospace Engineering (2006)
In this thesis, risk management methods are investigated in order to integrate risk management practices into the Turkish Aerospace industry. The research presents the sequence of risk management processes as identification of risk, analysis of risk, risk planning etc. Risk analysis methods named as Risk Ranking and Analytical Hierarchy Process (AHP) are investigated in order to improve reliability and safety of the systems or processes in the aerospace industry. The main aim of using risk ranking and AHP t...
Application of a rapid methodology for preliminary appraisal of kaolinite deposits
Cetin, Mahir Can; Altun, Naci Emre (EDP Sciences; 2016-09-28)
An approach that facilitates the mineralogical-compositional analysis and beneficiation-classification procedure was used for fast assessment of the evaluation possibility of kaolin deposits. The approach was applied on two different kaolin deposits from the Aegean region in Turkey. The kaolin samples were characterized using XRD and XRF analyses to determine the key mineralogical characteristics and major components such as Al2O3. The samples were then subjected to the attrition-scrubbing-hydrocycloning pr...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
İ. Dikmen Toker and M. T. Birgönül, “Application of an Integrated risk management system (IRMS) to an international construction project,” presented at the ARCOM 2006, (4 - 06 Eylül 2006), 2006, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/88264.