The Resource allocation capabilities of commercial construction project management software for the resource leveling problem /
Rezvan Khah, Emad; Sönmez, Rifat; Atan, S. Tankut; Department of Civil Engineering (2014)
Critical path method (CPM) has been commonly used for scheduling of construction projects. However, CPM only considers the relations between the activities, but does not optimize the resource allocation. Resource leveling problem (RLP) concentrates on optimizing resource utilization histograms obtained by Critical Path Method (CPM) without changing the project duration. Resource leveling is crucial for effective use of construction resources particularly, manpower and machinery resources to minimize the pro...
Using cognitive maps for modeling project success
Atasoy, Güzide; Dikmen Toker, İrem; Department of Civil Engineering (2007)
In order to evaluate a project as successful or not, initially, the questions of “what are the factors affecting the success” and “according to whom and which criteria should the success be measured” should be answered. Both the factors and their influences vary depending on a project’s specific characteristics, different environmental factors affecting it, and different parties involved. These factors are not independent of each other and the interrelationship between them should be investigated as a whole...
Discrete time/cost trade-off problem in project scheduling
Hafızoğlu, Ahmet Baykal; Azizoğlu, Meral; Department of Industrial Engineering (2007)
In project scheduling, the activity durations can often be reduced by dedicating additional resources. Time/Cost Trade-off Problem considers the compromise between the total cost and project duration. The discrete version of the problem assumes a number of time/cost pairs, so called modes, and selects a mode for each activity. In this thesis we consider the Discrete Time/Cost Trade-off Problem. We first study the Deadline Problem, i.e., the problem of minimizing total cost subject to a deadline on project d...
The budget constrained discrete time/cost trade-off problem in project networks
Değirmenci, Güvenç; Azizoğlu, Meral; Department of Industrial Engineering (2008)
The time/cost trade-off models in project management aim to compress the project completion time by accelerating the activity durations at an expense of additional resources. The budget problem in discrete time/cost trade-off scheduling selects the time/cost mode -among the discrete set of specified modes- for each activity so as to minimize the project completion time without exceeding the available budget. There may be alternative modes that solve the budget problem optimally, however each solution may ha...
Development of a risk assessment tool for post-project appraisal
Anaç, Caner; Birgönül, Mustafa Talat; Department of Civil Engineering (2007)
As competition in the business environment increases, knowledge management becomes a critical success factor. Firms should be able to gather, analyze and reuse knowledge to support their strategic decisions. Construction firms should also analyze information in hand (completed and on going project data) and make it a part of their learning mechanism. Post-project appraisal is an organizational learning mechanism aiming to form an organizational memory. Organizational memory is a remedy for organizational am...