A case study on interaction between time and cost constituents of a mass-housing construction project.

Download
1993
Yılmaz, Arzu Barçın

Suggestions

A study on information based virtual value chains for business.
Taylan, Merve; Sayın, Erol; Department of Industrial Engineering (2001)
A study on subcarrier synchronizaton in ofdm systems.
Anıktar, Huseyin; Tanık, Yalçın; Department of Electrical and Electronics Engineering (2002)
A study on power-time optimal control of manipulators.
Tosunoğlu, L Sabri; Department of Mechanical Engineering (1981)
A Case Study on the Utilization of Problem and Solution Domain Measures for Software Size Estimation
AYYILDIZ, TÜLİN ERÇELEBİ; Koçyiğit, Altan (2016-09-02)
Detailed requirements is the primary input of software size measurement and effort estimation methodologies and a significant amount of time and expertise is needed for size measurement. In order to streamline size measurement and effort estimation, this study exploits the correlations between the problem domain measures such as the number of distinct nouns and distinct verbs in the requirements artifacts and the solution domain measures such as the number of software classes and methods in the correspondin...
A study on properyies of steel fiber reinforced concrete.
Cinar, Hayri; Department of Civil Engineering (1977)
Citation Formats
A. B. Yılmaz, “A case study on interaction between time and cost constituents of a mass-housing construction project.,” Middle East Technical University, 1993.