Implementation of the ISO 9001 quality assurance system in architectural firms; A case study: Prokon LTD.

Download
2002
Yücel, Tuba

Suggestions

Implementation of an ECB85 expansion system.
Tuna, Gürsel; Department of Electrical Engineering (1985)
Implementation of Risk Assesment Techniques to Coal Mines in Turkey
Karpuz, Celal (2001-08-22)
Implementation of horizontal well CBM/ECBM technology and the assessment of effective CO2 storage capacity in a Scottish coalfield
Sınayuç, Çağlar; Imrie, Claire E.; Syed, S. Amer; Korre, Anna; Durucan, Sevket (Elsevier BV, 2011-01-01)
In this study the theoretical and effective methane recovery and CO2 storage potential of four coal seams within a well characterised section of a CBM license in Scotland are estimated, considering different horizontal well patterns, the effect of permeability heterogeneity and the composition of the injected fluid. The study concerns the Airth area of the Clackmannan coalfield in the Scottish Midland Valley. The effort on building the static earth model and the history match results of the pre-existing ver...
Development of a computer program for diagnosis and treatment of hospital patients.
Ütük, Kazım; Department of Electrical Engineering (1985)
Implementation of a standard virtual terminal protocol.
Ekinci, Orkun; Bilgen, Semih; Department of Electrical and Electronics Engineering (1988)
Citation Formats
T. Yücel, “Implementation of the ISO 9001 quality assurance system in architectural firms; A case study: Prokon LTD.,” Middle East Technical University, 2002.