Neural network and regression models to decide whether or not to bid for a tender in offshore petroleum platform fabrication industry

Download
2009
Sözgen, Burak
In this thesis, three methods are presented to model the decision process of whether or not to bid for a tender in offshore petroleum platform fabrication. A sample data and the assessment based on this data are gathered from an offshore petroleum platform fabrication company and this information is analyzed to understand the significant parameters in the industry. The alternative methods, “Regression Analysis”, “Neural Network Method” and “Fuzzy Neural Network Method”, are used for modeling of the bidding decision process. The regression analysis examines the data statistically where the neural network method and fuzzy neural network method are based on artificial intelligence. The models are developed using the bidding data compiled from the offshore petroleum platform fabrication projects. In order to compare the prediction performance of these methods “Cross Validation Method” is utilized. The models developed in this study are compared with the bidding decision method used by the company. The results of the analyses show that regression analysis and neural network method manage to have a prediction performance of 80% and fuzzy neural network has a prediction performance of 77,5% whereas the method used by the company has a prediction performance of 47,5%. The results reveal that the suggested models achieve significant improvement over the existing method for making the correct bidding decision.

Suggestions

A generic risk and vulnerability assessment framework for international construction projects
Özcan, Gülbin; Dikmen Toker, İrem; Department of Civil Engineering (2008)
Project Risk Management (PRM) comprises of identification and assessment, analysis and mitigation of risk factors in order to meet the project objectives. Risk identification and assessment process has the greatest importance as the risk models are constructed based on previously defined risk sources and their interrelations. Although previous studies have concentrated on the relation between risk events and their consequences, the link between them must be modeled by considering the various chains of risk ...
Numerical simulation of unsteady flow in an oil pipeline under various hydraulic conditions
Turan, Emrah; Bozkuş, Zafer; Department of Civil Engineering (2006)
In the present study, transient flow analyses of a long oil pipeline are performed. Transient flow conditions are initiated by typical valve operations and pump trips that may be expected during operation of such pipelines. In order to simulate transient events an existing computer program called “Stoner Pipeline Simulator” has been used for a large number of hydraulic transient conditions. The program is based on the characteristics method solution of the governing water hammer equations. Locations that ma...
Evaluation of steel building design methodologies: TS648,Eurocode 3 and LRFD
Zervent, Altan; Yılmaz, Çetin; Department of Civil Engineering (2009)
The aim of this study is designing steel structures with the same geometry, material and soil conditions but in the different countries, and comparing these designs in terms of material savings. According to three steel building codes, namely TS 648, LRFD, Eurocode 3, same structures with various stories (2, 4, 6, 8, and 10) are analyzed and designed. To calculate the design loads, Turkish Earthquake Code 2007 and Turkish Standard 498 (Design Load for Buildings) are utilized when TS 648 is applied. When LRF...
Development of Fragility Curves for Single-Column RC Italian Bridges Using Nonlinear Static Analysis
Perdomo, Camilo; Monteiro, Ricardo; Sucuoğlu, Haluk (Informa UK Limited, 2020-05-07)
The main objective of this study is to assess the accuracy and suitability of Nonlinear Static Procedures (NSPs) in the development of analytical damage fragility curves for seismic risk assessment of large portfolios of Reinforced Concrete (RC) bridges. Seven NSP approaches, from widely used single-mode conventional pushover-based approaches to the more rigorous multi-mode conventional or adaptive pushover-based procedures are implemented. By systematically comparing fragility curve estimations in terms of...
Risk assessment of international construction projects using the analytic network process
Bu-Qammaz, Amani Suliman; Dikmen Toker, İrem; Birgönül, Mustafa Talat (Canadian Science Publishing, 2009-07-01)
In this study, an analytic network process (ANP), which can handle the interrelations between risk related factors, is proposed as a reliable technique for measuring the level of risk associated with international construction projects. Within this context, ANP is used to derive the relative priorities of risk factors as an input to a decision support tool, which can be utilized during bidding decisions. The decision support tool may help a decision maker to estimate the level of risk so that alternative pr...
Citation Formats
B. Sözgen, “Neural network and regression models to decide whether or not to bid for a tender in offshore petroleum platform fabrication industry,” M.S. - Master of Science, Middle East Technical University, 2009.