Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed
Date
2003-06-01
Author
Azizoğlu, Meral
Koksalan, SK
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
223
views
0
downloads
Cite This
We address the bicriteria problem of minimizing the number of tardy jobs and maximum earliness on a single machine where machine idle time is allowed. We show that the problem of minimizing the number of tardy jobs while maximum earliness is kept at its minimum value of zero is polynomially solvable. We present polynomial time algorithms for the maximum earliness problem subject to no tardy jobs and the maximum earliness problem for a given set of tardy jobs. Finally, we discuss the use of the latter algorithm in generating all efficient schedules.
Subject Keywords
Marketing
,
Management Science and Operations Research
,
Strategy and Management
,
Management Information Systems
URI
https://hdl.handle.net/11511/35694
Journal
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
DOI
https://doi.org/10.1057/palgrave.jors.2601478
Collections
Department of Industrial Engineering, Article
Suggestions
OpenMETU
Core
Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria
Ozlen, M.; Azizoğlu, Meral (Informa UK Limited, 2011-01-01)
In this paper, we consider a rescheduling problem where a set of jobs has already been assigned to unrelated parallel machines. When a disruption occurs on one of the machines, the affected jobs are rescheduled, considering the efficiency and the schedule deviation measures. The efficiency measure is the total flow time, and the schedule deviation measure is the total disruption cost caused by the differences between the initial and current schedules. We provide polynomial-time solution methods to the follo...
Scheduling parallel machines to minimize weighted flowtime with family set-up times
Azizoğlu, Meral (Informa UK Limited, 2003-01-01)
We describe and evaluate several branch-and-bound algorithms for an identical parallel machine scheduling problem with family set-up times and an objective of minimizing total weighted flowtime. The algorithms differ by choice of lower bound method. Computational results suggest conditions favourable to a particular algorithm as well as the range of problem sizes that can be optimally solved in reasonable CPU time.
Multi-objective integer programming: A general approach for generating all non-dominated solutions
Oezlen, Melih; Azizoğlu, Meral (Elsevier BV, 2009-11-16)
In this paper we develop a general approach to generate all non-dominated solutions of the multi-objective integer programming (MOIP) Problem. Our approach, which is based on the identification of objective efficiency ranges, is an improvement over classical epsilon-constraint method. Objective efficiency ranges are identified by solving simpler MOIP problems with fewer objectives. We first provide the classical epsilon-constraint method on the bi-objective integer programming problem for the sake of comple...
JOB-SHOP SCHEDULING UNDER A NONRENEWABLE RESOURCE CONSTRAINT
TOKER, A; KONDAKCI, S; ERKIP, N (JSTOR, 1994-08-01)
In this paper we consider the job shop scheduling problem under a discrete non-renewable resource constraint. We assume that jobs have arbitrary processing times and resource requirements and there is a unit supply of the resource at each time period. We develop an approximation algorithm for this problem and empirically test its effectiveness in finding the minimum makespan schedules.
SCHEDULING UNDER A NONRENEWABLE RESOURCE CONSTRAINT
TOKER, A; KONDAKCI, S; ERKIP, N (Informa UK Limited, 1991-09-01)
This paper examines a single-machine, non-renewable-resource-constrained scheduling problem where jobs have arbitary processing times and resource requirements. Unit supply of a resource is assumed at each time period. Performance criterion is makespan. It is proved that this problem is identical to the two-machine flowshop problem, enabling the use of Johnson's algorithm. Immediate extensions of this result are presented.
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
M. Azizoğlu and S. Koksalan, “Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed,”
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY
, pp. 661–664, 2003, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/35694.