Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
MEASURING THE IMPACT OF LEAN CONSTRUCTION PRACTICES ON PROJECT DURATION AND VARIABILITY: A SIMULATION-BASED STUDY ON RESIDENTIAL BUILDINGS
Download
index.pdf
Date
2017-01-01
Author
Erol, Huseyin
Dikmen Toker, İrem
Birgönül, Mustafa Talat
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
255
views
114
downloads
Cite This
Performance of the construction projects have been criticized for many years due to their low productivity rates and cost overruns as well as significant delays. Increasing number of dissatisfied customers compel practitioners to reform conventional practices of construction management. Lean construction has emerged as a result of these efforts in the industry. However, there are limited number of studies that demonstrate the practical benefits of lean construction applications. The aim of this paper is to untangle practical applications of lean construction and to reveal their benefits. A methodology was developed to compare the lean and non-lean scenarios of a residential building project by means of Monte Carlo simulation. Simulation models were generated through regular meetings held with construction planning experts. Research findings demonstrate that application of lean construction principles have a potential to improve the performance of projects by reducing both the total project duration and its expected variation. In addition, the study revealed that utilization of practical lean construction principles may result in a considerable amount of time reduction in wall construction and plastering activities of residential building projects. Although the findings of this study cannot be generalized, they are expected to encourage practitioners to adopt lean construction principles.
Subject Keywords
Construction industry
,
Construction management
,
Lean construction
,
Lean construction principles
,
Scheduling
,
Monte Carlo simulation
URI
https://hdl.handle.net/11511/41050
Journal
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
DOI
https://doi.org/10.3846/13923730.2015.1068846
Collections
Department of Civil Engineering, Article
Suggestions
OpenMETU
Core
Identifying the effects of lean construction principles on variability of project duration /
Erol, Hacı Hüseyin; Dikmen Toker, İrem; Birgönül, Mustafa Talat; Department of Civil Engineering (2014)
Performance of the construction projects have been criticized for many years due to their low productivity rates and cost overruns as well as significant delays. Increasing number of dissatisfied customers compel practitioners to reform conventional practices of construction management. Lean construction emerges as a result of change efforts in the industry. Lean construction promises a much better project performance by eliminating the waste and improving value to customer. Although many practical applicat...
Development of an IT-based tool for portfolio assessment and management for construction companies
Bilgin, Gözde; Dikmen Toker, İrem; Özorhon Orakçal, Beliz; Department of Civil Engineering (2019)
Development in the construction industry has leaded most of the construction companies to undertake more complex projects than before, which are generally executed concurrently. Therefore, project management routines of the companies may not support effective management of multi-projects. Project portfolio management approach has been suggested to meet requirements for coordinating multi-projects to meet strategic objectives under limited resources. Since project portfolio management requires a comprehensiv...
Identifying the barriers of implementing lean construction principals in developing countries
Markazi Movaghar, Ehsan; Elias Özkan, Soofia Tahira; Department of Building Science in Architecture (2016)
The construction industry is congested with many types of project management systems to control and manage construction projects but none of them really look in-depth to maximize the efficiency of the work flow and minimizing waste. The implementation of the lean construction principles into the local construction scene can improve the problems. However, lean construction is complex and can be risky if not properly managed. Lean construction efforts in some other countries have not been successful due to th...
DEVELOPMENT OF AN ACTIVITY-BASED LESSONS LEARNED PROCESS MODEL AND A TOOL TO SUPPORT SCHEDULING DECISIONS IN CONSTRUCTION FIRMS
Yılmaz, Anıl; Dikmen Toker, İrem; Birgönül, Mustafa Talat; Department of Civil Engineering (2021-11)
The construction industry still suffers from reaching critical objectives of projects like duration and budget. To deal with this situation researchers and practitioners realized the importance of knowledge management in the construction industry and put their increasing attention on it over the years. Especially, knowledge management utilization in planning and scheduling parts of construction management has made significant efforts to improve to meet projects objectives adequately. However, project knowle...
A Comparative study on direct analysis method and effective length method in one-story semi-rigid frames
Bektaş, Şinasi; Birgönül, Mustafa Talat; Department of Civil Engineering (2012)
Many factors such as unforeseeable events, managerial or financial problems of Contractor, insufficient technical capacity of Engineer's site team and so on may lead to delays in construction projects. Proper analysis of compensability and quantum of a delay event is very important. Any delay analysis application can be considered as a result of the combination of contract documents, scheduler, record keeping mechanism at site, communication among project participants, delay analyst and delay analysis metho...
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
H. Erol, İ. Dikmen Toker, and M. T. Birgönül, “MEASURING THE IMPACT OF LEAN CONSTRUCTION PRACTICES ON PROJECT DURATION AND VARIABILITY: A SIMULATION-BASED STUDY ON RESIDENTIAL BUILDINGS,”
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
, pp. 241–251, 2017, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/41050.