Project appraisal and selection using the analytic network process

2007-07-01
Where prioritization and selection process of large-scale construction projects is concerned, governments should consider various quantitative and qualitative criteria when choosing the best project alternative. The traditional benefit-cost (B/C) analysis has some drawbacks in terms of analyzing qualitative attributes that cannot be easily expressed in monetary terms. To eliminate this limitation, multicriteria decision-making techniques are proposed for the solution of project prioritization problems. In this paper, ail analytic network process (ANP) model is developed to demonstrate how the project selection process can be carried out by considering both quantitative and qualitative factors, as well as their interrelations. The decision network is grouped under four subnetworks, namely benefits. costs, opportunities, and risks. The selected alternatives are real highway projects that are in the investment agenda of the Turkish government. Using the proposed network model, four investment alternatives are assessed by a team of experts and achieved results demonstrate that the ranking of project alternatives may significantly change when the ANP model is used instead of the classical B/C approach.
CANADIAN JOURNAL OF CIVIL ENGINEERING

Suggestions

Risk assessment of international construction projects using the analytic network process
Bu-Qammaz, Amani Suliman; Dikmen Toker, İrem; Birgönül, Mustafa Talat (Canadian Science Publishing, 2009-07-01)
In this study, an analytic network process (ANP), which can handle the interrelations between risk related factors, is proposed as a reliable technique for measuring the level of risk associated with international construction projects. Within this context, ANP is used to derive the relative priorities of risk factors as an input to a decision support tool, which can be utilized during bidding decisions. The decision support tool may help a decision maker to estimate the level of risk so that alternative pr...
Comparison of experienced and novice cost estimator behaviors in information pull and push methods
Kiziltas, Semiha; Akinci, Burcu; Gonzalez, Cleotilde (Canadian Science Publishing, 2010-02-01)
Construction cost estimators mainly use analogy-based decision-making processes while estimating activity production rates in new bids They need to search information items that will help them in understanding the differences and similarities between the current and previously Completed projects to select appropriate production rates and make necessary adjustments to the selected production rates. The objective of the study is to understand the effect of information pull-push methods on the behaviors of cos...
A strategic safety management framework through balanced scorecard and quality function deployment
Gunduz, Murat; Simsek, Burak (Canadian Science Publishing, 2007-05-01)
The aim of this paper is to propose a safety management framework for construction companies. A literature review was carried out to identify significant factors that would improve safety performance. Two management tools-namely, the balanced scorecard and quality function deployment (QFD)-were used to construct the framework. Strategic goals were established for each of the following perspectives of the balanced scorecard: financial and cultural, employee, process, and learning. Afterwards, a questionnaire...
Geographic information system-based visualization system for planning and monitoring of repetitive construction projects
Sönmez, Rifat (Canadian Science Publishing, 2008-11-01)
This study presents a visualization system based on a geographic information system (GIS) for planning and monitoring the progress of construction projects that are repetitive due to their geometrical layout. A prototype system was developed and applied to an actual pipeline project to demonstrate the advantages of the proposed approach. The primary advantage of the system is improved visualization of geographical conditions and their impact on the progress rate. Enhanced visual representation of the schedu...
Assessment of overtopping reliability and benefits of a flood detention dam
Yanmaz, Ali Melih (Canadian Science Publishing, 2008-10-01)
There is a growing tendency to assess safety levels of existing dams and to design new dams using probabilistic approaches according to project characteristics and site-specific conditions. This study is a probabilistic assessment of the overtopping reliability of a dam, which will be designed for flood detention purpose, and will compute the benefits that can be gained as a result of the implementation of this dam. In a case study, a bivariate flood frequency analysis was carried out using a five-parameter...
Citation Formats
İ. Dikmen Toker and M. T. Birgönül, “Project appraisal and selection using the analytic network process,” CANADIAN JOURNAL OF CIVIL ENGINEERING, pp. 786–792, 2007, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/42045.