Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
Transmission and substation expansion planning using mixed integer programming
Date
2011-08-06
Author
Cebeci, Mahmut Erkut
EREN, Sinan
Tor, Osman Bülent
Güven, Ali Nezih
Metadata
Show full item record
This work is licensed under a
Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License
.
Item Usage Stats
144
views
0
downloads
Cite This
This paper presents a novel planning approach which optimizes size and location of new transmission substation (TS) investments considering capacity expansion of the existing TSs based on primary distribution network investment requirements. Mixed Integer Programming (MIP) is utilized and the problem is decomposed into investment and feasibility check subproblems. The algorithm is formulated to minimize total investment cost while supplying the spatial forecasted load considering a set of system constraints. The results of two numerical examples indicate that presented algorithm is adequate for determining requirements of new transmission substations and/or capacity expansions together with new HV/MV lines, via appropriate selection of candidates. Visualization of the planning algorithm results, in an iterative manner, gives very important verification signals regarding the necessity of the proposed investments.
Subject Keywords
Investments
,
Planning
,
Substations
,
Companies
,
Linear programming
,
Load flow
URI
https://hdl.handle.net/11511/43195
DOI
https://doi.org/10.1109/naps.2011.6024851
Collections
Department of Electrical and Electronics Engineering, Conference / Seminar
Suggestions
OpenMETU
Core
Congestion-Driven Transmission Planning Considering the Impact of Generator Expansion
Tor, Osman; Güven, Ali Nezih; Shahidehpour, Mohammad (2008-01-01)
This paper presents a multi-year transmission expansion planning (TEP) model which considers the transmission congestion and the impact of generation investment cost in the planning horizon. The Benders decomposition approach is utilized which decomposes TEP into a master problem and two subproblems representing security and optimal operation. The operation cost due to congestion (OCC) is considered in the proposed model given that the congestion level is a proper criterion for measuring the degree of compe...
Congestion-driven transmission planning considering the impact of generator expansion
TOR, Osman Bulent; Güven, Ali Nezih; Shahidehpour, Mohammad (2008-05-01)
This paper presents a multi-year transmission expansion planning (TEP) model which considers the transmission congestion and the impact of generation investment cost in the planning horizon. The Benders decomposition approach is utilized which decomposes TEP into a master problem and two subproblems representing security and optimal operation. The operation cost due to congestion (OCC) is considered in the proposed model given that the congestion level is a proper criterion for measuring the degree of compe...
Power loss reduction and voltage profile improvement via distributed PV site and size selection in smart grids: The case of North Cyprus
Abujubbeh, Mohammad; Fahrioğlu, Murat; Sustainable Environment and Energy Systems (2019-8)
The increased awareness of communities on climate change, the inefficiencies associated with power-system infrastructure, and the exponential growth in energy demand motivated donors, non-governmental organizations, consumers, firms, and investors to cooperate with governments to establish an efficient and reliable framework that meets all requirements while ensuring user security, known as the Smart Grid (SG). One of the most pivotal enabler-technologies for the transition toward SGs is Distributed Generat...
Carrier Phase Shift Method of SPWM for Concurrent Wired and Wireless Power Transfer Systems
Ayaz, Enes; Altun, Ogün; Keysan, Ozan (2022-01-01)
This paper presents an approach for concurrent power transfer to wired and wireless systems using just a single inverter. The approach utilizes a novel carrier phase-shift (CPS) method that independently controls the inverter output voltages at the fundamental and switching frequencies. This proposed method can be a cost-effective solution to wireless power transfer (WPT) systems used in contactless slip rings (CSR), which transfer power to auxiliary loads such as sensors, radars, and IoT devices. There are...
Hydro inflow forecasting and virtual power plant pricing in the Turkish electricity market
Çabuk, Sezer; Kestel, Sevtap Ayşe; Danışoğlu, Seza; Department of Financial Mathematics (2016)
Hydro inflow forecasting with most accurate quantitative models is a very crucial subject for effective hydro optimization, virtual power plant pricing, volume risk management and weather derivatives pricing in the Turkish electricity market. Predicting increase or decrease in hydro inflow, seasonal characteristics of hydrological years such as wet, dry or normal, allow the decision makers to economically use water for optimal periods, quantify of volume risk and determine effective portfolio management strat...