Show/Hide Menu
Hide/Show Apps
Logout
Türkçe
Türkçe
Search
Search
Login
Login
OpenMETU
OpenMETU
About
About
Open Science Policy
Open Science Policy
Open Access Guideline
Open Access Guideline
Postgraduate Thesis Guideline
Postgraduate Thesis Guideline
Communities & Collections
Communities & Collections
Help
Help
Frequently Asked Questions
Frequently Asked Questions
Guides
Guides
Thesis submission
Thesis submission
MS without thesis term project submission
MS without thesis term project submission
Publication submission with DOI
Publication submission with DOI
Publication submission
Publication submission
Supporting Information
Supporting Information
General Information
General Information
Copyright, Embargo and License
Copyright, Embargo and License
Contact us
Contact us
A case study of highway project evaluation in the Black Sea coast of Turkey (The case of Giresun - Trabzon highway, Yolagzi- Esbiye section).
Date
1974
Author
Kaman, Fikri
Metadata
Show full item record
Item Usage Stats
59
views
0
downloads
Cite This
URI
https://hdl.handle.net/11511/4328
Collections
Graduate School of Natural and Applied Sciences, Thesis
Suggestions
OpenMETU
Core
A comparative study on the actual and estimated seismic response of Kiralkizi Dam in Turkey
Çetin, Kemal Önder; Batmaz, S; Karabiber, S (Informa UK Limited, 2005-07-01)
Kiralkizi Dam, a 120 in high earthfill dam located in Diyarbakir city, Turkey, was shaken by a moment magnitude, M-w = 4.6 earthquake at an epicentral distance of 8 km, on December 24, 2000, at 13:31 local time. The seismic response of the dam was assessed by using spectral ratios between (i) available crest and foundation records (C/F), (ii) horizontal and vertical components of the recorded motions (H/V), (iii) by performing 2 dimensional finite difference-based seismic response analyses (Flac-2D), and (i...
A Comparative Study on Seismic Isolation Applications in Turkey
Akyüz, Uğurhan; Caner, Alp; Yakut, Ahmet (null; 2017-04-27)
Design of seismically isolated hospital structures have become popular in Turkey within last five years especially after Ministry of Health’s policy change. The new hospital complexes of about twenty campuses has been either under design or scheduled for planning for the next five years. The Ministry strictly requires use of seismic isolation systems for high risk seismic regions not only to mitigate the adverse effect of earthquakes on structures but also to keep operating expensive medical devices just im...
A study of center revitalization in the case of Akköprü.
Göksu, Sezai; Department of City Planning (1982)
A study on job-site wastage of building materials in the construction industry of Turkey
Ergün, Ozan; Saranlı, Türel; Department of Architecture (1999)
A case study of slope stability on Bursa-Yalova highway.
Ataman, Gürol Bekir; Department of Civil Engineering (1976)
Citation Formats
IEEE
ACM
APA
CHICAGO
MLA
BibTeX
F. Kaman, “A case study of highway project evaluation in the Black Sea coast of Turkey (The case of Giresun - Trabzon highway, Yolagzi- Esbiye section).,” Middle East Technical University, 1974.