Supplier involvement in automotive component design: Are there really large US Japan differences?

1996-01-01
Liker, JK
Kamath, RR
Wasti Pamuksuz, Syeda Nazlı
Nagamachi, M
Typical descriptions of Japanese supplier management portray first-tier suppliers as partners in product development from the early concept stages of design, whereas US first-tier suppliers are provided detailed specifications and blueprints and build to print. This paper examines US/Japan differences in supplier involvement in design based on a 1993 survey of 143 Japanese and 189 US automotive component suppliers. The focus is on the relationships between Japanese component suppliers and their largest Japanese customers and between US component suppliers and their largest US customers. The data indicate US companies have levels of supplier involvement in product development rivaling Japanese companies. In both countries there is a high level of supplier involvement in product development from the early stages of design, particularly among suppliers of major subsystems, This high level of involvement in the design of competitively significant subsystems poses a challenge to the predictions of traditional transaction cost economics, Nor do theories that explain Japanese supplier involvement based on high levels of 'trust' provide adequate explanation. Rather, Japanese customers seem to rely on other forms of control - target prices, performance monitoring, competition, and mutual dependence to control suppliers entrusted with the design of complex subsystems. There is evidence that despite the early involvement of suppliers by US companies, they are still weak on some of the underlying business infrastructure and technical processes that contribute to the Japanese automakers' success.
RESEARCH POLICY

Suggestions

Flexible assembly line design problem with fixed number of workstations
Barutcuoglu, Sirin; Azizoğlu, Meral (Informa UK Limited, 2011-01-01)
In the paper, we study a flexible assembly line design problem with equipment decisions. We assume the task times and equipment costs are correlated in the sense that for all tasks the cheaper equipment gives no smaller task time. Given the cycle time and number of workstations we aim to find the assignment of tasks and equipment to the workstations so as to minimise the total equipment cost. We develop a branch and bound algorithm that uses powerful lower bounds and reduction mechanisms. Our computational ...
Part-mix allocation between automated and conventional manufacturing
KAYALlGIL, M. SINAN (Informa UK Limited, 1990-10)
The overall part-mix of a production system is allocated optimally between the existing conventional facilities and planned automated system to be acquired. Approximate mean value analysis (MVA) is utilized to evaluate performance of the automated system under trial part-mix allocations. Cost of processing and WIPs are taken as the sources of operational costs. Cost minimizing route allocations when alternatives exist are handled by a search procedure.
Capacity and tool allocation problem in flexible manufacturing systems
Bilgin, S.; Azizoğlu, Meral (Informa UK Limited, 2006-06-01)
This study addresses an allocation problem that arises in the semiconductor industry and flexible manufacturing systems where the tools should be loaded on computer numerical controlled (CNC) machines to process a number of operations. The time and tool magazine capacities of the CNC machines and the number of available tools of each type are limited. The objective is to maximize the total weight of operation assignments. We present a mixed integer programming formulation of the problem and show that the pr...
Supplier involvement in design a comparative survey of automotive suppliers in the USA UK and Japan
LIKER, JEFFREY K; KAMATH, RAJAN R; Wasti Pamuksuz, Syeda Nazlı (1998-09-01)
This paper examines supplier involvement in design based on survey data from 145 Japanese, 189 US and 87 UK automotive component suppliers. First, cross‐national differences in the degree of supplier involvement are examined. Second, regression analysis is used to identify factors which predict high or low levels of supplier involvement in design. Third, the effects of supplier involvement in product development on the degree to which products are designed for manufacturability are assessed. The data show t...
Integrating knowledge with suppliers at the R D manufacturing interface
ROSELL, DAVID T; LAKEMOND, NICOLETTE; Wasti Pamuksuz, Syeda Nazlı (Emerald, 2014-02-01)
Purpose - Many manufacturing firms source components and subsystems from suppliers. Consequently, the suppliers' product and manufacturing knowledge is a central concern at the interface between R&D and manufacturing. This paper aims to specifically investigate how supplier knowledge is integrated and what role trust plays in knowledge integration with suppliers at the R&D-manufacturing interface. Design/methodology/approach - The study is based on qualitative case studies of two different collaborations w...
Citation Formats
J. Liker, R. Kamath, S. N. Wasti Pamuksuz, and M. Nagamachi, “Supplier involvement in automotive component design: Are there really large US Japan differences?,” RESEARCH POLICY, pp. 59–89, 1996, Accessed: 00, 2020. [Online]. Available: https://hdl.handle.net/11511/43873.