Multi-Mode Resource Constrained Project Scheduling Problem With a Single Nonrenewable Resource

2016-10-06
Altıntaş, Cansu
Azizoğlu, Meral
In this study, we consider a project scheduling problem with a single nonrenewable resource. We assume that the resource is released in scheduled times at specified quantities and the resource is consumed at activity completions. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. Our problem is to select the modes and timings of the activities so as to minimize the project completion time. We give an efficient mathematical formulation and discuss some approaches for its solution.
Uluslararası Katılımlı 16. Üretim Araştırmaları Sempozyumu (12-14 EKİM 2016)

Suggestions

A Resource Constrained Project Scheduling Problem With Multi-Modes
Altintas, Cansu; Azizoğlu, Meral (2020-01-01)
In this study, the authors consider a project scheduling problem with a single non-renewable resource. The authors assume that the resource is released at scheduled times and specified quantities and the resource is consumed at activity completion. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. The problem is to select the modes and timings of the activities so as to minimize the project completion time. The authors give a m...
LP relaxation-based solution algorithms for the multi-mode project scheduling with a non-renewable resource
Azizoğlu, Meral; Pamir, Selin Kirbiyik (2015-01-01)
In this study, we consider a multi-mode resource allocation problem with a single non-renewable resource. We assume the resource is released at defined time points and at defined quantities. We also assume that the activity costs are charged once they are completed. Our aim is to minimise the project completion time. We formulate the problem as a pure integer programming model and show that it is strongly NP-hard. We find lower bounds by pure and mixed integer linear programming relaxations of the model and...
A Branch and Bound Algorithm for a Multi-Mode Project Scheduling Problem With a Single Non-Renewable Resource
Altıntaş, Cansu; Azizoğlu, Meral (2020-04-01)
In this paper, a project scheduling problem with multi-modes and a single non-renewable resource is considered. The resource is released in pre-specified times at pre-specified quantities. An activity can be executed at different modes where a mode is defined by a processing time and a resource requirement amount. The objective is to minimize the project completion time. A branch and bound algorithm that enumerates the partial solutions based on the mode assignment decisions is presented. The results of the...
A Multi-mode project scheduling problem with a single nonrenewable resource
Altıntaş, Cansu; Azizoğlu, Meral; Department of Industrial Engineering (2017)
In this thesis, we consider a multi-mode project scheduling problem with a single nonrenewable resource. We assume that the resource is released in pre-specified times at pre-specified quantities and the resource is consumed at activity completions. The activities can be processed at different modes where a mode is defined by a processing time and a resource requirement amount. Our problem is to select the modes and timings of the activities so as to minimize the project completion time. We develop a mixed ...
Resource investment problem with time/resource trade-offs
Çolak, Erdem; Azizoğlu, Meral; Department of Industrial Engineering (2011)
In this study, we consider a resource investment problem with time/resource trade-offs in project environments. We assume each mode of an activity is characterized by its processing time and resource requirement and there is a single renewable resource. Our aim is to minimize the maximum resource usage, hence the total amount invested for the single resource. We formulate the problem as a mixed integer linear model and find optimal solutions for small sized problem instances. We propose several lower boundi...
Citation Formats
C. Altıntaş and M. Azizoğlu, “Multi-Mode Resource Constrained Project Scheduling Problem With a Single Nonrenewable Resource,” İstanbul Teknik Üniversitesi – İşletme Fakültesi, İstanbul, Türkiye, 2016, p. 100, Accessed: 00, 2021. [Online]. Available: https://hdl.handle.net/11511/74296.